Austin Globe
AustinGlobe.com Sunday 5th February 2012 Edition 36/10
Follow us on Follow us on TwitterFollow us on facebook
bullet
Front Page Austin Globe Public Forum
corner

Message from



If you think this post is inappropriate, please click here.

dMyYVegAnXRfGsyqPK

acBhg9 owvauktnoksf, [url=http://qfqcraqdqtvb.com/]qfqcraqdqtvb[/url], [link=http://kkyjenosereb.com/]kkyjenosereb[/link], http://mevfyxtebfkb.com/

wroaplr
desyqrgaq

If you think this post is inappropriate, please click here.

Mexican Americans

The President of the U. S. arrived in Austin to raise money for his four year campaign and insulted millions of Americans in reference to his remarks of a "Moat stocked with Alligators" between Mexico and the U.S"

He owe millions of legal Americans from all walks of life for even thinking of this, when thousands have died in Mexico seeking a better life and to escape terrorism in their homeland. Yes, men women and children.

That is low life campaigning seeking support of the Hispanic vote in the U.S. and Mexico.

The same man denied aid to Texas for education and victims of the disasters in Texas. We Democrats are insulted he come to Texas to beg for money.

Jack O. Lewis
4600 Sabelle
Ft. Worth, Tx. 76117
817-838-2116

Jack Lewis
Ft. Worth

If you think this post is inappropriate, please click here.

LAST TO LAST

I will let you guys mull on this meal for a while. Don't forget to write!

Mike

SOMETIMES IT IS HEAVENS GATE
SOMETIMES IT IS A BIT TOO LATE

LOVE IS ETERNAL, IT IS NEVER A SHELL
LOVE IS ETERNAL, A GRACE FROM THE WISHING WELL

ALWAYS AND SOMETIME,
ALWAYS I SHALL

ALWAYS AND SOMETIME
AT THE WISHING WELL

AN ACCIDENT SERVES ITS BLESSING
A BLESSING BLESSED BY GOD

AN ACCIDENT SERVES ITS BLESSING
OH, DON’T BE A ROAD HOG!

I FOUND A GAL AROUND THE CORNER
OH WHAT GRACE DID I FIND

I FOUND A GAL AROUND THE CORNER,
SOMETHING WONDERFUL WAS FOUND!

SHE WANTED SOMEONE TERRIFIC,
SHE WANTED TO ESCAPE FROM HELL!

SHE WANTED SOMEONE THAT WAS TERRIFIC,
MY LIFE, MY WANT, MY DREAM,

OH, NO, NOT A REJECTION!
NOT A REJECTION, OH NO WAY!

BUT YOU SEE, SHE HAD ENOUGH OF ME!
SHE CAST ME OUT OF HER HOME!

TEARS EVERYDAY, TEARS EVERYNITE!
OH HOW I WISHED SHE WAS WITH ME!

OH HOW, WITH ALL MY MIGHT!

GONE FOREVER, MY LOVE IS LOST!
GONE FOREVER, OH WHY DIDN’T MY LOVE LAST!

NEVER AGAIN AND NEVER THE SAME!
GONE FROM MY HEART!

NEVER AGAIN AND NEVER THE SAME!
WAS I ALL TO BLAME!

THE SUN SHINES DAY AND THE SUN SHINES NIGHT!
OH HEAVENLY BLISS!

THE SUN SHINES DAY AND THE SUN SHINES NIGHT!
I KNOW SHE ENDED UP PISSED!

GONE TODAY AND GONE TOMMORW!
GONE A MONTH AND A YEAR!

GONE TODAY AND TOMORROW!
HOW DOES ONE REALLY KNOW?

LOVE HER TODAY AND AGAIN AND AGAIN,
WATCH OUT SATAN, PLEASE BEWARE,

SHE WAS MINE AND NOT YOURS!

BUT I GUESS THAT I DIDN’T HAVE THE RIGHT!
TO CLAIM HER AS MY OWN!

THE TEARS AND FEARS IN IMPOSSIBLE FATES,
ALONE AGAIN, AND WITHOUT A CLUE!

WAS SINGLEHOOD THE BEST?

AFTER AND BEYOND, NO CLUE, BUT TO DO ONE’S BEST!
MAYBE IT WAS AFTERALL MY MASTER’S MAJOR TEST!

THUS WE KNOW AND TOGETHER WE BLEND!
WHAT EVER WOULD HAPPEN NEXT,
OH I HOPE THAT SHE IS ALSO ALWAYS BLESSED!

THE TIME IS GONE, AND MY LOVE IS HERS SO,
GONE, IT ALL, GONE, AND NOTHING TO DO!

SO LET US CELEBRATE LOVE, TRUE LOVE,
AND AT LAST NEVER MORE, OH NEVER MORE,

NOTHING LASTS IN THIS LIFE, NOTHING,
NOTHING LASTS, THIS IS MY LAST STAND!

LOVE BELONGS AND LOVE IS A SONG,
NEVER AGAIN, IT IS JUST ME AND ME AGAIN!

SO MY DREAM REMAINS ALIVE AND MY DREAM
WILL MAGICALLY WAVE ITS WAND!
AND LOOKY HERE AND LOOKY THERE!

MY ANGEL, WHO LET ME GO!
IS AT LEAST FREE AT LAST!

Michael C Hecht PE (Missouri Bourbon)
GEORGETOWN, TX

If you think this post is inappropriate, please click here.

Roughed up by Obama!

The trouble with fusion by Michael C Hecht PE
• view
• edit
This submital was returned unread by the Obama Camp...
My application to the US Patent office has been received. It has to do with pure fusion energy and the system approach that I take will allow us to take what I have devised and go directly into the design phase.
Particles are accelerated from rest to light speed. There are two thousand streams in each individual "shot" Once all these particles, that are highly reactive hit, a large amount of energy is released (round 6000 megawatts). In a nutshell, it works; and a massive amount of energy will thus be available to turn the turbine blades, as the collision point revolves rapidly around the tunnel.
You should think about this; as you think about your nonsense and your wind energy proposals (how much power do you get when it isn't windy) as well as your solar power proposals (how much power do you get when it is too cloudy?") and your (really stupid clean coal proposal, (which will just bury a huge problem for future Americans in the ground)
And of course your ethanol plants; that burn natural gas and a hell of a lot of it; and the ethanol created has a lot less energy in it then the natural gas) Boy guys, we should just eat the corn! And send the rest overseas to hungry people!
Now the fusion idea? It is just as advertised! It is pure energy and enormous energy and safe energy and 24 hour a day, 7 days a week energy.
I think right now; it is the only way. So I should have word soon on a process that can be proven with today's technology; Very Very Very HOT fusion that help all of us out of the turmoil that we are in!!
Are you going to think about it? I still can't understand why non engineers think they can save the earth, when they have no training in it? Would you ask a grocery clerk to remove a wart off of you butt? Start thinking guys....Would you hire a guy that mows lawns to do your taxes instead your CPA?
I am just like a CPA, but I am called a PE which means professional engineer, the only guys certified to do the energy analysis that you keep claiming to be your own. I hope that you guys start thinking straight! The last thing I want to mention is that there has been evidence from lab tests that we already CAN produce a fractional burst resulting in 3 megawatts of electricity.
My twist on that fact is to simply multiply it thousands of times an hour in 2000 identical streams, so that each set of 2000 parallel reactions will create 6000 megawatts. We can continue to create these batches of energy indefinitely. And there isn't any harmful radiation left over, that is the beauty of it..Think about it!
My process is called the; "Hecht Fractional Batch Single Plant System"
Try to prove it wrong!! You Can't!
Remember it is very very hot! Now let go of those egos! Don't you really want to save the planet? Hey guys! If it is absolutely necessary, I will take the word "Hecht" off of it (which means walleye) And replace it with "Obama" even though he doesn't know either!!!
So OK guys, let us call it the Obama Process!
It is only fair! So mellow out! Help is coming! Maybe help is here! Pump your fists in the air!
My intention is to simply blow every one away and stop this whole mess with all its misconceptions, and I only have one question of Obama (and I really need to know this before I vote;)
Does Obama DISH or does he Obama GUN??? Let me know. Even if you don't like my ideas; I do need to come to some final conclusion about Obama! So let me know the secret!! DISH or GUN!!???
As for me, I never never pass it back! NEVER!
I always gun gun gun!
Have a nice day folks! And I hope that you guys mellow out and aren't too perturbed with a PE (whatever that means!)
Now I am going to let you in to one my trade secret..remember keep it secret!!
MY DESCRIPTION OF FUSION;
TWO PARTICLES WHO REALLY DON'T LIKE EACH OTHER ALL ARE FORCED CLOSER AND CLOSER TOGETHER DESPITE THEIR RESISTANCE.
AT SOME POINT, SUDDENLY THE TWO PARTICLES START TO STRONGLY ATTRACT; AND THEN THEY FUSE TOGETHER IN A FIT A PURE ESTASY RELEASING INCREDIBLE AMOUNTS OF ENERGY!
AND THEN THEY LIVE HAPPILY EVER AFTER!!!
(OH HOW I LOVE LOVE STORIES!!!)
Michael C Hecht P.E.(Professional Engineer)
Submitted by nakedbedroom on October 14, 2008 - 1:05pm.
Books | printer friendly version | send to friend
Search





News | Business | Sports | Entertainment | Living/FYI | Shop Local | Classifieds | Jobs | Cars | Homes
About KansasCity.com | About


Michael C Hecht PE (Missouri Bourbon)
GEORGETOWN, TX

If you think this post is inappropriate, please click here.

Bozzos for Fun!

WE ELECT BOZOS FOR FUN

LOOK TO YOUR WEST
LOOK TO THE EAST

YOU CAN SEE THEM COMING
YOU CAN SMELL THEIR FEET

ACRES ABOVE
THEORIES BELOW

REMEMBER TO ALWAYS, ALWAYS
EAT THAT YELLOW SNOW

OH COME ON GUYS!
BE GOOD TO THE EARTH

OH COME ON GUYS!
WHAT COULD BE WORSE?

HINGES AND DOOR WAYS
COWS ARE NERVOUS

HINGES AND DOORWAYS
ALL WITHOUT PURPOSE

CAN WE REALLY BELIEVE
AND NOT BE DISMAYED?

BILLIONS OF DOLLARS
WHAT IS THE DELAY?

AUGUST IS THE MONTH
DIRE CONSEQNCES WILL FALL;

GRAB U A GUN,
AN JUS SHOO EM ALL!

NOVEMBER HAD THE DAY
STATUES OF CLAY

NOW LOOKY HERE
NOW LOOKY THERE

SUMMER IS LONG GONE
OH, WHO REALLY CARES?

JACK ASSES IN WASHINGTON
A VERY HAPPY LOT

JACK ASSES IN WASINGTON
THEY ALL CAN BE BOUGHT

DONKEYS AND ELEPHANTS
NARY A CARE

DONKEYS AND ELEPHANTS
A COUNTRY FAIR

OH COME ON GUYS!
TEETH NEATLY BRUSHED AND CLEAN!

OH COME ON GUYS!
WHAT DO YOU REALLY MEAN?

FRINGE BENEFITS AND FUR COATS
ALL MONEY ASSIDE

FRINGE BENEFITS AND FUR COATS
AND DANCE LIKE FRED ASTAIRE

SO LOOKY HERE AND LOOKY THERE
DONKEYS AND ELEPHANTS
AT THE COUNTY FAIR

NO BRAINS IN THE LOT
NO BRAINS ANYWHERE

NO BRAINS IN THE LOT
BUT WHO REALLY CARES

WE SHOULD STOP THEIR DIRECT DEPOSITS
AND ISSUE FRESH UNDERWEAR

ORANGE JUCIE AND CABBAGE
IT IS JUST NOT FAIR

YOU SEE THOSE IDIOTS AMONG US
VOTED IN THE WHOLE ZOO

THOSE IDIOTS AMONG US
ARE YOU AND YOU AND YOU!


MISSOURI BOURBON (A PO 8)



Michael C Hecht PE (Missouri Bourbon)
GEORGETOWN, TX

If you think this post is inappropriate, please click here.

Only God Knows!

PRINCIPALS, GENTLEMEN, PRINCIPALS PART 2


DID YOU ENJOY THE REPAST?
CAN YOU MAKE IT LAST?

TRAFFIC ON SUNDAYS
AROUND THE BEND

TRAFFIC ON SUNDAYS
DID YOU THINK ABOUT IT THEN?

ASSES AND ELBOWS
I GOT CAUGHT INBETWEEN

ASSES AND ELBOWS
BUT EVERYTHING GOT CLEAN

OH LOOK AT THE SUNRISE!
LOOKY HERE AND LOOKY THERE

OH LOOK AT THE SUNRISE
IN YOUR UNDERWEAR

LOOK AT WHO IS COMING
UP THE NARROW LANE

LOOK AT WHO IS COMING
AND WHO IS TO BLAME

NOW DON’T GET EXCITED
AND DON’T GET PALE

OH DON’T GET EXCITED
JUST STAY OUT OF JAIL

IT WILL BE OVER IN A MOMENT
A MOMENT COMES AND A MOMENT GOES

IT WILL BE OVER IN A MOMENT
AND THEN NOBODY KNOWS

SO LOOK AT THE SAGE BRUSH
AND LOOK UP THE STREET

LOOK AT THE SAGE BRUSH
AND SMELL YOUR OWN FEET

COME ON, GUYS, DON’T JUST SIT THERE
DON’T SIT THERE AND WEEP

COME ON GUYS
GET RID OF THE CAUTION,
NEVER ACCEPT DEFEAT

SO ASK HOW IT IS GOING
AND SET IT ASSIDE

JUST ASK HOW IT IS GOING
THEN HANG ON FOR THE RIDE

CROSS YOUR FINGERS
BEND YOUR TOES

CROSS YOUR FINGERS
AND DON’T WAIT UNTIL YOU ARE TOO OLD

EVERY DAY
AND EVERY NIGHT

EVERY DAY
FIGHT FIGHT FIGHT

OH IT IS UNUSUAL
YOU BET, THAT’ IS TRUE

OH IT IS UNUSUAL
COME ON BACK,
HAVE SOME STEW

SO ON AGAIN IS OFF AGAIN
AND OFF AGAIN IS ON

WATCH THE PRETTY LADY
BURST OUT IN SONG

SO MUST I REPEAT
AND DO NOT STARE

SO I MUST REPEAT
AND DANCE LIKE
FRED ASTAIRE

SO LOOKY THERE AND LOOKY HERE
STAND UP STRAIGHT
CHECK YOUR UNDERSEAR

AND PLEASE DON’T BE LATE
NOW THAT IT HAS STARTED,

PERHAPS YOU HAVE A CLUE
NOW THAT IT HAS STARTED

THERE IS NOTHING ELSE TO DO


I NEED ANOTHER DRINK!

MISSOURI BOURBON (A PO 8)

Michael C Hecht PE (Missouri Bourbon)
GEORGETOWN, TX

If you think this post is inappropriate, please click here.

My Big Toe or Here he is again!

Here he is again!
• view
• edit
Larry King;
What are you talking about?
Mike;
Oh, love, hate, stuff like that!
Larry;
On what basis does your authority lie?
Mike;
Oh, I guess I am a thunderbolt; anyway who really cares?
Larry;
All of America is watching!
Mike;
Watching what?
Larry;
Watching you!
Mike;
Watching me do what?
Larry;
You are avoiding the questions!
Mike;
Listen you fng butthole! I have the answers! And you fng know nothing, know nothing!!
Larry (gasping for breath);

Commercial!!! Commercial!!!

Mike (talking to no one in particular);
So there you have it!! The ones in charge are incredibly stupid!! Fusion is pretty easy for us folks; us engineers! But the fng bubbleheads are in charge and there is little we can do! Oh, we can dream, of a better world with the guys in charge...guys like me! But maybe it can't ever happen!!! Gotta sister?? Around my age!! I am available, you know? Just one gal! Just one gal! I am not greedy!! How does fusion work?? Well two particles, that don't really like each other are forced closer and closer together, and that just mounts the resistance, until a moment comes that is very very weird!! They start attracting each other!! and then they bond creating an incredible bang! This releases an incredible amount of energy!! Thus the world's problem is solved!!! Try it in the bedroom, I swear to you it will work!! Be happy! Help is coming! Don't sell your investments! help is coming! And all will be well! I hate to tell you guys, but I know what I am doing! Imagine that! I, a American middle class boy from the Heartland is going to do something amazing!! Again, don't sell your stock quite yet! America might be on the rebound!

Sincerely,

Your friend and mine,


Michael C Hecht PE

(maybe a genious with a gigantic ?)
Take care, I know you can't print this, but share it with your friends for a few laughts!! America needs to laugh more!!


Michael C Hecht PE (Missouri Bourbon)
GEORGETOWN, TX

If you think this post is inappropriate, please click here.

My letters are always free

I used to send a lot of press releases to the kansas city star. they put a lot of them on the internet. I am hoping to do that here also. I moved to Texas a few weeks ago. The patent is real, but I have no idea what to do with it. No one has refuted it,but no one has affirmed it either. I hope that someday I can see it happen, but I am just a broke mere son of a gun and I don't know how it will all turn out. I understand that you have to evaluate each letter and I expect that some will be rejected. That is OK. I know the drill. Best wishes and I hope you laugh a lot with me, cry a lot with me and I hope magically someday, we all wake up in a better world someday!

Yours in prose,

Eat my shorts!

Mike

PS REV 8 of patent below;

God Bless!!!

REVISION 8

THE ATITUDE OF THE SCIENTIFIC COMMUNITY, TRANSENDS ANY PRODUCT IN ANY THEATER. THE PURPOSE OF REVISION 8 IS TO ILLUMINTE TO THOSE PARTICLE PHYSICISTS, THAT ANY AND ALL STATED MEASURES IN DISPUTE, IN THIS DOCUMENT, TO NOT DISCHARGE THEIR DUTY TO INVESTIGATE; PROPAGATE ALL SAID PARTICLES AT REQUIRED VELOCITIES AND TEMPERATURES; AND THAT SUCH VESSELS CARRY ALL THAT THE INVENTOR HAS SUGGUSTED TO THE LABORATORY. A KEY PROVISION OF THIS INVENTION IS THAT THE INVENTOR ONLY DEFINES “A SYSTEM” AND THAT HE CLAIMS NO PRIMA FACI EVIDENCE OF ANYTHING OTHER THEN THE DEFINITION OF A “SYSTEM” APPROACH TO A DAUNTING PROBLEM. THE CHAMBER ITSELF HAS A PROPOSED CROSS SECTIONAL AREA THAT MAY NOT MAKE A VIABLE SYSTEM, AND THE ROTATIONAL SPEEDS, AND THE ASSUMED ACCELERATION TECHNIQUES NEED TO BE “PROVEN” AND AS THE ASSIGNED HAS NO BASIS IN FACT, IT IS OBVIOUS THAT A CAREFUL EXPERIMENTAL APPROACH IS REQUIRED, THUS IT IS THUS NOTED AT THIS JUNCTURE IN THIS DOCUMENT, THAT THIS PROPOSED “SYSTEM” CANNOT BE USED PRIMA FACI. THIS INVENTION WILL NEVER BECOME “NOTE WORTHY” UNTIL SOME SUPPORT EVOLVES TO SUPPORT THIS FUSION OPTION AS “FUNDENMENTALLY SOUND” WITH A FEW “GLARING ERRORS” BUT CARRIES ENOUGH OF A BASIS, AND WITH THE HELP OF SOME TOP NOTCH, HANDS ON PHYSICISTS, THESE IDEAS CAN BE INVESTIGATED IN NUMEROUS LABS, AROUND THE COUNTRY. IT IS SUGGUSTED THAT THE BEST APPROACH IS TO PUT DOWN CALULATORS, AND THE GREAT GIFTS OF ADVANCED MATHEMATICS; AND OBSERVE THE TRUE NATURE OF THIS DEVICE IN EXPERIMENT AFTER EXPERIENCE. IT IS SUGESTED THAT FUNDS ARE AVIALABLE WITH THE “DEPARTMENT OF ENERGY” FOR RESEARCH AND EXPERIMENTATION. THIS AUTHOR FURTHER ASSERTS THAT THE MAXIMUM GRANT IS ONE HUNDRED THOUSAND DOLLARS. THERE IS NO MOTIVE IN THIS DOCUMENT TO CONFUSE OR TO CONVEY ANYTHING BUT A LOGICAL APPROACH TO ONE OF EARTHS MOST PRESSING NEEDS. THUS IT IS REQUIRED TO IMPLEMENT THIS MOST RECENT ACTION SET UPON ON APRIL 27 2009. THEREFORE, ALL MARKS AND ALL MERIT SHALL BE OPEN TO DISCUSSION AND IT SHALL BE AGREED THAT THE PURPOSE, MERIT, AND TRANSPERANTCY SHALL GAIN IN ITS PURPOSE, AND GAIN IN RATIONAL THOUGHT, AS IT MIGHT TAKE SIGNIFICANT INVESTIGATION ON WHAT THE “BEST WAY” TO MOVE FORWARD, EGOS AND ARRAGANCE ASSIDE, IS. THUS THE ADBRIDGED STATEMENT OF ALL PURPOSES, WILL ORGANIZE AND BECOME THE VESSEL IN WHICH ANY AND ALL ACCKNOWLEDGEMENTS SHALL BECOME ONE UNIFIED AGREEMENT WHICH ADMITS THAT “THE SYSTEM AS NOTED IN THE “OCTOBER 14, 2008 PROVISSIONAL PATENT” HAS MERIT. NOTES AND MEASURES, NOT WITHSTANDING THE FOLLOWING SYSTEMS THAT HAVE BEEN DECLARED AS HAVING MERIT AND WHICH INCLUDE THE FOLLOWING CODICILS SHALL BE REVISED AS EXPERIMENTAL DATA IS RECORDED AND ANALYSED. SUCH VALUES AS GIVEN AS MERIT IN THIS DOCUMENT ARE ONLY “BALL PARK” EQUVILENTS, AS MEASURED BY A MECHANICAL AND ELECTRICAL ENGINEER WITH A SUITABLE BACKGROUD WHO READILY ADMITS THAT HE IS NOT THE ANSWER, BUT MAY BE A BEACON WHICH TO WHICH HE WILL REMAIN TRUE TO ONLY ONE CLAIM. TO BE HONEST AND FORTHRIGHT AND TO ALLOW ALL IDEAS EQUAL MERIT AND AS THIS PROJECT GAINS MOMENTUM ANY AND ALL FACTS PERTAINING TO SAID CLAIM ARE CLAIMED BY THE INVENTOR TO BE BALL PARKED AND NOT FINAL, NOR IS THERE ANY INTENTION TO LEAD ANY PARTY TO ANY CLAIM EXCEPT AS MENTIONED MANY TIMES IN THIS PATENT, THAT TRANSPERANTCY SHALL EXIST AT EVERY LEVEL AND THE OBJECTIVE OF THE ONE SHALL BECOME THE OBJECTIVE OF ALL OF THE INTERESTED PARTIES. NONWITHSTANDING THE PRINCIPAL OUT COME, UNLESS IT IS CLEAR TO WHAT VALUES SHOULD BE OBTAINED, IT SHALL BE DEEMED “PRIMA FACIE THAT THE AUTHOR’S PRELIMINARY METHODS MUST BE REVIEWED AND TESTED IN THE PROPER LABORATORY VENUES. THUS “THE SYSTEM” SHALL LBE DEEMED “ACHIEVABLE” AND IT SHALL BE REGOGNIZED THAT EVERY EFFORT AND EVERY MEANS SHALL MATCH THE LATEST VALUES AS ADJUSTED BASED ON SAFE MEANS OF EXPLORATION IN THE MANY LABORITORIES IN THIS COUNTRY. SO DESPITE THE FACT THAT THE AUTHOR ; AS IF THE INVENTOR IN ALL HONESTY, MAY HAVE “PULLED HIS ANSWERES “ OUT OF HIS BUTT;” REST ASSURED, THAT THAT NEVER HAPPENED! THUS WITH THE TRANSPERANTCY AND TRUST IT IS HOPED THAT THESE ADDITIONS TO THE “SYSTEM APPROACH” WILL BE MORE IN THE RANGE OF THE VALUES THAT WOULD BE EXPECTED AS “NORMAL” AND EXPECTED TO BE OBTAINED THROUGH THE EMPIRICAL EVIDENCE GAINED THROUGH WELL THOUGH OUT EXPERIMENTS. WITH THE OWNERS TRUST AND SATISFACTION IT IS ADMITTED THAT HE HAS A LACK OF EXPERTISE IN CERTAIN AREAS, AND IT IS ACCKNOWLEDGED THAT THESE ERRORS HAVE CAUSED A “LACK OF TRUST’ BUT IT IS HOPPED THAT THESE HANDS ON PHYSISTS WILL MAKE AMENDS AND HELP SOMETHING THAT MAY HAVE GREAT MERIT BECOME GREAT MERIT, DESPITE ITS OBVIOUS DEFICIENCIES.

REVISON 8 VALUES WHICH HAVE BEEN OBTAINED WITH ADDITIONAL THOUGHT AND REVIEW OF PREVIOUS RIVISIONS OF THE PATENT VALUES HAVE INDICATED THAT THIS AMENDMENT IS REQUIRED.

EACH NOTION OF “REVISION 8” SHALL REFLECT THE AUTHOR’S DESIRE TO IMPLEMENT, REFLECT, NOTIFY, AND CLEAN UP TROUBLING ERRORS THAT HAVE CAUSED THIS VIABLE SYSTEM TO BE REJECTED IN JOURNAL AFTER JOURNAL. SAID REVISIONS SHALL BE HIGH LIGHTED IN YELLOW WITHIN THE PROVISIONAL PATENT. ALL SUCH MARKS REPRESENT THE PRESENT REVISON, “REVISION 8” AND SUCH REVISIONS AND MONUMENTS, AND THUS, ALL OTHER METHODS CONTAINING THE WORD, “VIABLE” WILL THUS GIVE PRELIMARY VALUES AND “NEED” AND AS NOTED AND HIGHLIGHTED THROUGH VARIOUS MEANS, SHALL NOTE THAT THE IMPORTANCE AND THEREFORE, THE THOUGHFARE SHALL BE NOTED AS “PRESENT” THUS ANY AND ALL COMPLAINTS SHALL BE STRICKEN AND IT SHALL HEREBY BE NOTED THAT THE INVENTOR, ALSO KNOWN AS MICHAEL C HECHT PE, SHALL RECOMMEND ALL NOTIONS AND ALL EFFORTS AND WITH EACH EFFORT ANY AND ALL MEASURES TO OBSERVE AND RECORD WITH EFFORT AND WITH THE ACCKOWLEDGEMENT THAT THE “SYSTEM” IS VIABLE, WITH EFFORT.

VERY TRULY YOURS,

MICHAEL C HECHT PE




















REVISON 7
REVISON 7, INDICATED IN ITALICS ADDS AN ADDITIONAL FUNCTION WHICH IN ITS USE WILL MODIFY ANY ACTIONS AT THE TWO COLLISIONS SITES. SUCH MODIFICATION SHALL INDUCE RATHER THEN ACTIVELY ACT AT SAID COLLISON SITES AN ELECTROMAGNETIC FIELD (FINAL APPROACH IS FOR THE PHYSISTS TO DECIDE) FOR THE COMPRESSING OF THE PARTICLE STREAMS 100 TO 1; AT THE POINT OF COLLISONS. SAID REVISION, UPON REVIEW HAS BEEN ADDED TO SAID PATENT APPLICATION FOR IT IS EXPECTED THAT THAT FLAME ACCELERATION (OR OTHER APPROACH DEEMED MORE VIABLE) ALONE WILL EQUATE FUNDEMENTAL MEASURES WHICH ALSO CAN ALSO BE REALIZED BY THE MANUFACTURE OF ALL SUBSTANCES, ALL VARIENCES AND THUS EACH AND EVERY MANUFACTURE OF SAID SUBSTANCES THAT COLLIDE SHALL THUS RENDER A MORE COMPLETE FUSION PROCESS.







REVISION 6;

ALL UNDERLINED ITEMS HAVE BEEN ADJUSTED AS TO THE MERIT OF THE “ENGINEER” AS SOME QUANTITIES WERE MISTATED WITHIN THE ORGINAL SUBMITTED PATENT APPLICATION. ALL RIGHTS AND PRIVELEGES UNDER SAID APPLICATION, SHALL THUS RESIDE AS THEREIN AND THUS ALL MEANS AND ALL APPLIANCES AND SUCH TERMS AS NEEDED TO DESCRIBE ALL FUNCTIONS SHALL HEREBY BE SEALED AND RECOGNIZED AS THE PURPOSE AND THE MEANS AND THE CONCLUSIONS WITHIN THIS DOCUMENT HAVE BEEN ALTERED AS NEEDED IN THIS REVISION 6 TO RESOLVE ANY AND ALL CONFUSION WHICH IS HELD IN TRUST BY “THE ENGINEER” MICHAEL C HECHT PE

APPLICATION TO THE APPEARANCE IN QUANTITY AND TRANSPARENTCY
FOR THE REVOLVING COLLIDING FUSION FIELD POWER PLANT SYSTEM

A FULLY AND COMPLETELY DESCRIBED INVENTION; SOLELY AS INTERPETED, AND CLEARLY NOTED AS FULL AND COMPLETE.


FORWARD

Rotating Fusion Field

This device marks and addresses all issues, patents, quotations, and articles, where the strata and the methods used contain other earlier versions.

The function of this invention is the proper and expedient use of conventional uses, purposes, and techniques in the solving of one of the most perplexing problems, which despite many many attempts; the conditions, purposes, and designs of many many scientists have failed.

The following description, operation and function are the result of independent reasoning, which is not of; or the result of duplication, but of independent analysis by which, an novel approach in theory has led to a independent and completely new design for the development, testing, and completion of a prototype fusion “BATCH” accelerator system, which will revolutionize all thinking and future designs for the utilization and use of fusion reactions which, at present cannot be contained.


USE, NEEDS AND FUNCTIONAL CHARACTERISTICS

This device will be used to provide, single out, devise, equip, and contain, all articles, all means, all quantities and all marks that maintain and support said device. The organization, management, and propellant necessary will be the source and the drive equipment will be supplied as necessary to provide the energy necessary for the distribution and delivery of at a minimum 2500 megawatts of useable energy in a typical plant, for the convenience and proper use; fashioned from common construction techniques to render the development, placement and implementation of the device in a reasonable amount of time. Great care must be taken in this endeavor. Careful planning with good design techniques will ensure its success!


The inner chamber shall direct the fusion reaction in a large oval, in conjunction with the magnetic field cores in their saddles with all the supporting structure. Electrostatic acceleration which shall be deemed “achievable” shall consist as otherwise noted in this system description of 1 ¼ inch 316 stainless tubing, welded as required to fit and maintain any and all functions without harming particle flow. The electrostatic grids shall be procured and installed in place per the direction of the particle physicists whose knowledge and foresight shall be utilized, as the establishment of the two fields will be field tested and the final operating conditions of the new fusion plant and as the goal is to maximize the accelerations and thus achieve the target velocities within a smaller length of tunnel, it is clear that “the system” control will have to be adjusted to maximize the magnetic and electrostatic forces to achieve the highest acceleration possible.. It is expected that with the right arrangement of the two tools, and as stated above, the entire perimeter of the “device” can be greatly reduced as it will be possible to achieve greater accelerations and greater accelerations mean that whatever the final decision is on the needed velocities that these velocities may possibly be achieved in a smaller length of the chamber. Two perforated plates each with thirteen hundred holes mainly arranged in a square matrix will be placed near the top of the oval, in one of the arches. . A known and adjustable amount of hydrogen isotopes (ions) will be injected in the two plenums between the two plates and thirteen hundred pairs of particle streams will be directed in opposite directions; as one set of streams travels and is accelerated on the right path; the other set of particle streams will be accelerated on the left path. The two plenums shall have adjustable timing so that the locations of the impact shall be known and calculated precisely. The suggested “stoichiometric mixture” oxygen - hydrogen flame heated portion of the tunnel (which is in the “inert area”) shall be assumed to be “viable” until disproven in the lab, and thus any portion of said volumes which shall be calculated and applied to render the “best achievable” result may be adjusted from the suggested “ten feet” before the collision point. As noted elsewhere in this document, other heating options may be explored if the hydrogen oxygen flame does not perform as needed. The multiple collision point, simultaneous fusion reaction shall naturally “drift” in a clockwise manner, when the collision point is on the left and shall naturally “drift in the counter clockwise direction; because of the differences in the momentum on the two sides of the collision point. It is expected and expedient that any and all achievable results be included, to the satisfaction of the inventor of “the system” as it reasonable that a high enough “drift speed” can be accomplished simply by varying the velocities at impact. It is also noted that “achievable” velocities before impact, greatly increase as the cross sectional areas at the collisions are going to be designed to “compress” to 1/100 the their original size at the point of collision; and the resultant nomial velocity shall be adjusted, as required;
“as fast as necessary” around the chamber,(adjustments to “achievable velocity” may be required to avoid “shell damage”) until the fusion goes out. The initial collision will take place in the classified “inert” section of the chamber. The inert section commences 45 degrees above the Yoke in the arch which indicates that within said arch, 5200 feet of the arc shall be constructed of the “classified material” mentioned elsewhere in this document. The portion of the straight section of the chamber which is constructed of the “classified material shall be initially assessed so that the total linear and curved sections of the inert classified chamber shall be approximately 7000 feet on each side. The “start” of each of the “inert” sections shall be 45 degrees “up” from the end of the “arch” on each side or as noted; approximately 45 degrees “down” from the baffled plates on each side. The collision point shall be located 200 feet from the end of the “arch” on both sides and in the “inert” area marked and typical kinematics equations shall be utilized to obtain both the predictions of the accelerations of the particle streams as well as the impact velocity from both sides of the oval after the necessary compression. The two collision points shall be, as noted; located 200 feet below the arc on the two baffled plate sides of the arch shall be accelerated by any and all means to meet the acceratlion and final collision velocities. Target velocities at the point of collision are slated initially as 1.6 times ten to the sixth meters per second nominal velocity (clock wise travel of the particle streams coming from the left) and 1.4 times ten to the six meters per second from the opposite side (counter clockwise), yielding 2 times ten to the fifth nominal velocity in the direction of the decreasing batch fusion reaction. At the point of collision the two averaged set of particle streams will be compressed as stated, by electromagnetic options, in stages which be determine by “hands on” physicists. (force fields to be determined by particle physicist must include; means to decrease the total cross-sectional area at the collision site 100 to 1. The average velocities of the rotating fusion collision thus should be around 1.6 times ten to the eighth initially from the “Left” side of the oval and 1.4 times ten to the eight meters per second from the “Right” side of the oval in the “compressed area” of the particle streams. The predicted acceleration noted from both sides of the chamber shall be determined with well known calculation methods and thus the actual lengths that the chamber requires will be calculated from such known methods and thus the actual perimeter of the chamber shall be determined from such calculations and said “system” shall be immediately adjusted as there is a need for expediency as the “selection of the site” for the plant cannot be justified without having knowledge of said distance.

After the initial collision, there shall be no further acceleration required. The particle density will rapidly decrease and it is expected that the “cloud” of high energy particles will move clockwise, rotating, while reacting to the backwards momentum that will occur as the particles that have “collided” in the batch scatter to the full cross section of the chamber. The systems will automatically fire a second fusion set of collisions just as soon as the heavy duty vacuum pumps, which will evacuate the chamber as fast as it is required, so that one fusion firing can directly follow another and another and another. It might be possible to “fire” several batches in a row before the chamber gets too saturated with particles. Part and parcel, it will be required to evaluate all such proposals and this addition to the system, will only be termed “viable” after the appropriate testing has been accomplished.
The passages in the plate coil will be supported by the cryogenic pumps as required to drive and supply the necessary liquid nitrogen. All nitrogen piping shall be properly insulated and headers will be fully and completely formed connecting each plate coil to the nitrogen source. The heated, high pressure nitrogen at the outlets shall also be completely collected and shall be utilized as the input to the turbine sections which will drive the generators.


MANNER OF PROPELLING THE COOLING MEDIUM

In the forward, there is no mention of all the functions and proper conditions needed to accomplish the action and proper maintenance, thus this article will in detail describe the function and purpose of all the necessary pieces of equipment, needed for the device to function properly. The device, fundamentally, works to rotate the fusion reaction, to prevent damage to the chamber walls; which currently is in a static position in all previous designs. The heat exchanger sections are composed of an inner chamber fabricated out of plate coil. The inner chamber shall be constructed of plate coil within which liquid nitrogen shall flow. The inner shell shall be oval in shape. The straight part of the cross section is suggested as 16 feet and the radius of each arc shall be 3 feet which means that the height of the chamber shall be at 6 feet. In some cases the chamber must be specially made to achieve its purpose. The exact geometry of the cross section shall be carefully evaluated in the design phase. It is meaningful here to acknowledge that technologies and techniques which will be required to achieve the purpose; of achieving a batch system of pure energy have no prior evidence or knowledge and thus the techniques as given in these articles are not currently in any article or notice and thus are independent and unique. The suggested standard size of the plate coil shall be 4 feet X 8 feet, but in all cases, plate coil overall length and width shall reflect standard sizes whenever possible. Plate coil passages and their interstitial nature as far as heat transfer characteristic and goals shall be carefully evaluated as the time does not permit that analysis here. It is suggested that the plate coil cooling passages shall be specified will allow a minimum flow rate of 80 gallons per minute of liquid nitrogen with little pressure drop; within the interstitial passages of each plate coil panel, thus cooling the inner chamber walls and rendering the reaction continued movement which thus creates a proper environment for the batch fusion process, which is sufficient in density so that the fusion reaction can be sustained as it rotates in the magnetic field. The resulting transfer of energy from the inner chamber to the liquid nitrogen passages will not be excessive as long as the flow rate of the liquid nitrogen is maintained, closely evaluated and that the measurements in the laboratories and in the field show their merit. It is noted that the rotating collision point starts immediately on impact and cycles the entire track; and as the liquid nitrogen absorbs the energy and heats up, it shall be expelled in a cycle, which at one point drives and absorbs all manners, motions, and fluid drives, which are coupled to generators of such size as to service populations as large as 2 million people. It is also suggested that as the system is “proven” that enough vertical space be available in the underground caveran to built another oval directly on top of the first oval and that provisions be made for any other artifact needed to double the nominal generating capacity. A percentage of the electrical energy which is produced will of course be required to energize all plant requirements including high capacity vacuum pumps and other necessary sub systems.
1
The objective of this new plant is the utilization of fusion energy. It is defined as the HECHT FRACTIONAL BATCH SINGLE PLANT SYSTEM, which will survive many many revolutions and will provide pure energy conversion, by the conversion of deuterium / tritium atoms to helium and whereby all by products, will be inert and therefore a great benefit shall be rendered to the existing electric power industry and therefore to the public at large.


SECTION 1

AN IN DEPTH TREATSIE CONCERNING THE DEUTERUIM / TRITIUM LEVELS AND THE ROTATING BATCH FUSION PROCESS.

A SUMMARY; FULLY AND EQUALLY DISTRIBUTED, TO ANY AND ALL PARTIES, WHO BECOME LICIENSED WITH FULL ATTENTION GIVEN TO THE RIGHTS AND PRIVLEGES OF SAID INVENTOR; MICHAEL C HECHT PE, WITH FULL KNOWLEDGE AND APPROVAL OF ALL CONCERNS; AS WELL AS ALL VERSIONS, AND ALL KINDS OF PLACEMENTS, AS WELL AS ACCOMPANYING PLANS AND OPERATIONAL NOTICES TO THE CONTRARY; AS WELL AS ALL GRIVENANCES.

THUS ALL METHODS AND CONCERNS AS WELL AS ALL VARIANCES IN CONCEPTS, IDEAS AND METHODS AND THUS ALL TIMES AND MEASURES SHALL BE ACCOMODATED; AS WELL AS ALL CONTROL METHODS, AND ALL CONCERNS; SHALL HEREBY, AND SUBSEQENTLY, ALL WEIGHTS AND MEASURES; QUANITITES NON WITHSTANDING, AND WITH AMPLE NOTICE; ALL ABOVE GROUND AND BELOW GROUND APPERTANCES, SHALL HEREBY BE UNDER THE COMMAND AND CONTROL TROUGH CONCEPT, DESIGN AND CONSTUCTION AS TO THE FLUID DYNAMICS OF THE PURPOSE CONTAINED THEREIN; AS WELL AS ALL OUTSTANDING ISSUES, WHICH SHALL BE SUMMARILLY BE DISMISSED, AS TO THEIR MERIT AND UNDERSTANDING.

THUS; THIS PATENT WILL REPRESENT CONCEPT, PLANNING AND CONSTRUCTION TECHNIQUES AND THE UNDERSTANDING OF ALL MERRITS; AS WELL AS ALL TECHNICAL CHALLENGES NON WITHSTANDING ANY AND ALL CLAIMS TO THE CONTRARY; SHALL THUS BE UNDER THE CONTROL AND MANAGEMENT OF THE DIRECTOR OF THIS ENTERPRISE; MICHAEL C HECHT PE; WHO WITH FORESIGHT AND DIRECTION WILL COMAND ALL MERRIT AND THUS SHALL IMPLEMENT ALL MEASURES AND DEVICES AS SUPPORTED AND DIRECTED; BY THE AUTHORITIES HAVING JUSRISDICTION, AS SUCH MEASURES WILL BE DEEMED IN PURPOSE AND WITH PROOF; AS SHALL ALL SUCH OPERATIONS OF SAID PATENT.

FREQUENTLY THE CONCEPTS WHICH APPEAR HERE WILL BE PROVEN “ON THE GROUND” AS THERE ARE NO PROVEN TECHNOLOGIES, AS SUCH, AND THE MERITS, UNDERSTANDING, AS WELL AS ALL PROCESSES OF SAID PLANT SHALL OFTEN BE ADJUSTED AS KNOWLEDGE IS GAINED IN THE PROCESS, OPERATION, AND MAINTENANCE OF SAID POWER PLANT.

THE TECHNIQUES; AS WELL AS THE VISION; AS WELL AS ALL OPERATIONS, FEEDBACK, AND CONTROL OPERATIONS AND ISSUES; AS WELL AS CURRENT TECHNOLOGY ISSUES, AND PATENTS NON WITHSTANDING, SHALL OFTEN BECOME ISSUE AND SHALL OFTEN REQUIRE ADDITIONAL LICENSING TO MAINTAIN CURRENT AND FUTURE PLANT CONSTRUCTION ON SCHEDULE; WITHOUT EXCESSIVE DELAY AS MEANINGFUL SUB ASSEMBLYS SHALL BE CONSTRUCTED WITH BINDING CONTRACTS; RESPECTING ANY AND ALL CLAIMS ON EACH SUB ASSEMBLY, BUILDING OR OPERATION WITHIN THE PLANT BOUNDRIES.

THUS THE EFFECT AND PROGRESS OF EACH PLANT SHALL BE MONITORED AND SAID GOVERNMENT AUTHORITY SHALL RENDER ALL MEANS; AND THUS, ELIMINATE THE NEED FOR FREQUENT COURT ACTION; AND THUS, THE VISION, DESIGN SPECIFICATIONS AND DRAWINGS SHALL BE IMMEDIATELY APPLIED IN THE FIELD AS THE TIME OF THE EARTH REACTIONS IN RESPECT TO THE VIABILITY OF MANKIND, ARE UNKNOWN AND SUCH PLACEMENTS SHALL BE AND MUST BE RESPECTED AND ACKNOWLEDGED IN PERUITY.

ALL REVISIONS WITHIN PLANT BOUNDRIES SHALL IMMEDIATELY BECOME EVIDENT AND ALL DESIGN SPECIFICATIONS AND METHODS; AS WELL AS SAID PLANS AND SPECIFICATIONS SHALL BE IMMEDIATELY MODIFIED, REVISED, ETC PER FIELD NOTATIONS;

THUS SYSTEM TECHNOLOGY SHALL BE CONTINUOUSLY UPDATED AS SAID SYSTEM IS CONSTRUCTED, WHICH INCLUDES START UP FUNCTIONS AS WELL AS OPERATIONAL DATA. AND FREQUENTLY NEEDED ADDITIONAL ASSISTANCE IN THE CONCEPTS, PLACEMENT, AND MATERIALS OF CONSTRUCTION AND SEQUENCES OF OPERATION OF THE BINARY OPERATION OF THE SINGLE PLANT STRUCTURE SHALL BE CONTINUOUSLY MONITORED AND SUCH LATEST TECHNIQUES SHALL HEREBY BE APPLIED IMMEDIATELY TO PLANT STRUCTURE.


















SECTION 2

AUTHOR’S NOTE;

THE PURPOSE OF THIS SECTION, IS TO FUTHER DESCRIBE CERTAIN CONCEPTS TO MANY QUESTIONS, WHICH MAY STILL REMAIN, AS SEVERAL ITEMS THAT ARE IMPLIED AND INTENDED IN THE PREVIOUSLY NOTED SECTIONS, ARTICLES, PAGES, AND PARAGRAPHS ARE NOT PRESENTLY FULLY PRESENTED, AS THE MAIN INTENTION OF THE PREVIOUS SECTIONS WAS FOR A GENERAL DESCRIPTION, WHICH LEFT OUT SPECIFIC DETAILS, INTENTIONALLY, SO THAT THE STAFF OF PATENT ATTORNEYS, AGENTS, AND ENGINEERS, WHO WORK ON MANY MANY CASES, COULD QUICKLY DISCERN THE GENERAL PURPOSE OF THE INVENTION; AND THAT THE DETAILS WOULD BE ASSUME, SO THAT THEY COULD BE QUICKLY WORKED OUT.

1. ITEMS OF DISCLOSURE; TO BE INCLUDED IN THE APPLIED PATENT;


A. THE ENGAGEMENT OF THE BATCH FUSION PROCESS, WILL BE CONTROLLED BY A SERIES OF PLCs (PROGRAMABLE LOGIC CONTROLLERS) WHICH SHALL BE CAREFULLY CHOOSEN FOR THE PURPOSE.THIS SERIES OF PLCs SHALL ALL HAVE COMPLETE IDENTICAL BACKUP SYSTEMS, 3 IN TOTAL, AND SHALL PROVIDE THE MEANS, PURPOSES, PROGRAMMING (FOLLOWING THE SEQUENCE OF OPERATIONS EXACTLY) AND SHALL BE CONTRACTED TO A THIRD PARTY WITH EXTENSIVE EXPERIENCE IN THE FIELD. SUCH PROCESSES SHALL ORGININATE; THUS, ALL UNDERSTANDING AND TECHNIQUES; AS SUCH, BY THE PROVABLE NATURE OF THIS PATENT SHALL THUS ORGANIZE AND THUS MENTION WITH ALL TRUST ALL METHODS AND PROCEDURES AND THUS SAID METHODS SHALL BE KNOWN BY ALL CONTRACTORS OF IDENITY AND THUS ALL TRAFFIC BETWEEN PARTIES AS WELL AS ALL SUMS AND MEASURES AS WELL AS ALL CAREFULLY MONITORED AND CONTROLLED MEASURES SHALL BE RENEWABLE AND THUS PLACED IN THE CONTROL OF THE AUTHORITY HAVING JURISDICTION; WITH ALL RESPECT TO THE PLEASURE AND THE PERMANENT PERMISSION IN PETUITY OF THE AUTHOR AND AS GIVEN ALL DIRECTION AS REQUIRED AND AS NECESSARY AND SHALL BE NOTIFIED OF ALL ACTIONS OF SAID AUTHORITY AND SHALL FREQUENTLY BE ASSURED AS NOTIFIED TO THE PLEASURE OF THE PATENT APPLICANT.

B. THE BATCH PROCESS SHALL INJECT A KNOWN QUANITY OF DEUTERIUM / TITIUM MIX INTO EACH CHAMBER PLENUM, LOCATED BETWEEN THE TWO DISTRIBUTION PLATES, CAREFULLY MOUNTED WITH APPROXIMATELY 1300 ORIFICE SIZE HOLES (HOLE SIZE TO BE CAREFULLY PLACED AS MENTIONED AND CALCULATED TO REPRESENTATIVE SIZE, QUANITY AND NATURE AS NECESSARY SO THAT FREQUENT ADJUSTMENTS MAY BE MADE IN THE FIELD; AS THE NATURE OF THIS PROCESS DICTATES ALL FUNCTION AND THE EXPECTATION IS THAT FUTHER REFINEMENT WILL BE REQUIRED IN THE FIELD; AS THE TESTING AND INSTRUMENTATION, LANGUAGE AND NATURE OF SAID INVENTION SHALL BE PERFECTED THROUGH TESTING; AS WHEREBY THE EXACT NATURE OF CERTAIN PROCESSES WILL BE EXPERIMENTAL IN NATURE AND THUS ALL PROCESSES, AND NATURES, THUS ALL MERRIT SHALL EXIST IN SYSTEM TECHNOLOGY; AND THUS, ALL FUTURE MODIFICATIONS TO INVENTION SHALL REMAIN THE PROPERTY OF THE UNITED STATES GOVERNMENT.

C. THE INITIAL PLATES SHALL HAVE ORIFICES DRILLED IN SAID PLATE, 2 INCHES ON CENTER; IN A SQUARE MATRIX. SAID PLATES WILL HAVE 1300 INITIAL ORIFICES EACH; CAREFULLY PLACED, SO THAT EACH PAIR OF HOLES IN SAID TWO PLATES WILL BE EXACTLY LINED UP IN VERTICAL AND HORIZONTAL POSITION; SO THAT EACH BATCH PROCESS WILL CREATE TWO; 1300 IDENTICALLY PLACED MIRROR IMAGE STREAMS; WHICH WILL BE ACCELERATED IN OPPOSITE DIRECTIONS. THE TWO PLATES THAT ARE REQUIRED SHALL BE MOUNTED 2 FEET APART WITH 2 INDEPENDENT SECTIONS; EACH OF WHICH WILL BE INDEPENDENTLY CONTROLLED BY THE ACTION OF THEIR RESPECTIVE VOLUMETRIC CYCLINDERS; WHICH SHALL BE SIZED RESPECTIVELY TO ALLOW AMPLE EXPERIMENTATION AS TO SIZE, QUANITY AND TIME OF EXPELLATION OF SAID INDEPENDENT BATCHES. EACH SECTION SHALL BE BAFFLED SO THAT THE PRESSURE DROP TO EACH SET OF ONE HUNDRED SQUARE MATRIX HOLES SHALL BE EQUAL.

D. SAID PLATES SHALL COMPLETELY SEAL OFF CHAMBER AT THEIR RESPECTIVE LOCATIONS. THE FUSIBLE QUANITIES SHALL BE INJECTED AT CLOSE TOLERANCES; SO THAT EACH STROKE INTO EACH PLENUM SHALL MEET THE REQUIREMENTS OF THE BATCH PROCESS.

E. AT SPECIFIC DISTANCES AROUND THE PERIMETER OF THE CHAMBER, MAGNETIC FIELD CORES SHALL BE CAREFULLY MOUNTED WHICH SHALL CONTAIN AN INNER SHIELD AND WALL, WHICH, WILL DIRECT AND ACCELERATE SAID PARTICLES TO THE PROPER IMPACT VELOCITY, SO THAT THE FUSION REACTION SHALL OCCUR. THE INJECTED DEUTURIUM / TRITIUM MIX (CAREFULLY MEASURED AND METERED) WILL ALLOW A CONTROLLED BURN OF EXACTLLY MEASURED DURATION, SO THAT THE PROCESS WILL ALWAYS BE CONTROLLED AND SO THAT THE SPONTANEOUS IGNITION CAN NOT HARM THE INNNER SHELL. ELECTROSTATIC GRIDS, COMPOSED BY MANUFACTURING A CLOSED NETWORK OF SQUARE 304 STAINLESS STEEL TUBING SHALL BE PLACED AT AN EQUAL DISTANCE BETWEEN EACH OF THE MAGNETIC FIELD CORES. EACH PARTICLE STREAM SHALL BE DIRECTED TO ITS RESPECTIVE CENTER WITHIN THE TUBING WHICH LIES THEREIN. THE ELECTROSTATIC ACCELERATING GRIDS SHALL NOT BE PLACED WITHIN THE INERT SECTIONS OF THE CHAMBER. THE CHOSEN THERMODYNAMICALLY FLUID SHALL BE PUMPED THROUGH THE INTERSTATIAL CONFINES OF EACH ELECTROSTATIC GRID.

F. THE VERY HIGH FUSION TEMPERATURE WILL BE DISAPATED THRU THE CONTINUOUS ROTATION OF THE FUSION REACTION POINT, WHICH SHALL SPREAD THOUGH ITS MECHANISIMS AN EVEN AND SAFE ABSORBTION OF THE RELEASED ENERGY OF THE CHEMICAL AND FUSION HIGH ENERGY EMISSION. AS SUCH THAT THE INITITIAL ENERGY RELEASE WILL BE ENORMOUS.

G. INITIAL FIRING CHAMBERS, TWO REQUIRED; NON WITH STANDING ALL VENTURES, SHALL BE FABRICATED AS THE NATURE AND THE TRUST REQUIRE IT; AND SHALL BE VERIFIED BY CONSTANT MONITORING; THUS ALL VISITS AND ALL ALERTS AND THUS THE VERY NATURE OF THE FORCES, LOGIC AND ORIGINS OF SAID PATENT MUST BE COMPLETELY ENCLOSED BY SAID MATERIALS OF A NATURE THAT ONLY THIS DOCUMENT AND NO OTHER SHALL LIST.

H. SUCH MATERIALS OF CONSTRUCTION; BY ITS VERY NATURE, SHALL BE FABRICATED AT ROOM TEMPERATURE AND ITS EXACT NATURE, LOCATION, AND PROMISE OF REFLECTION OF ALL ENERGY TRANSMISSIONS SHALL THUS BE CONCEALED FROM THE PUBLIC KNOWLEDGE AS SUCH KNOWLEDGE SHALL CONTAIN PRIMA FACI DATA AND THUS COMPLETE KNOWLEDGE OF SAID INVENTION, FORCES, TEMPERATURES AND ENERGY TRANSMISSIONS.

I. SAID KNOWLEDGE; NON WITHSTANDING ALL CLAIMS AND ADDITIONS, SHALL HEREBY BE ACCKNOWLEDGED WITHIN AND THROUGH SAID PARTITIONS; SAID PARTITIONS SHALL START AT THE END OF EACH ARCH. INITIAL COLLISIONS SHALL BE DESIGNED TO OCCUR 200 FEET PAST THE END OF EACH ARCH.COMPLETE INERT PARTITIONS SHALL BE 1500 FEET IN LENGTH. INERT PARTITIONS SHALL BE CONSTUCTED FROM CONTINUOUSLY FOCUSED BEAM TECHNOLOGY, WITH KNOWN FORCE FIELDS CONTINUOUSLY MONITORED.

J. AS SUCH FORCE TECHNOLOGY KNOWLEDGE IS ONLY KNOWN AT PRESENT TO THOSE PRESENT WITH TOP SECRET CLEARANCE; AND SUCH TECHNOLOGY WILL BE NEEDED TO SECURE SAID REACTION WITHIN. THE ENCLOSURE AND THUS ALL MEANS AND DISCLOSURES OF THE INITIAL1700 FEET OF FUSION REACTION MUST REMAIN CLOSED TO THE PUBLIC SCRUTINY; AND THUS THE FIRST SECTION OF EACH FUSION REACTION PARTITION CONSTRUCTION, MUST REMAIN IN THE CUSTODY OF TOP SECRET TECHOLOGY PERSONNEL’S HANDS; AND THUS ALL MEANS AND ACCELERATION TECHNIQUES IN SUCH SECTIONS SHALL BE STRICKEN FROM SAID PATENT; BUT MUST BE VIEWED BY QUALIFIED TECHNICAL STAFF OF THE UNITED STATES GOVERNMENT, DEPARTMENT OF ENERGY, L CLASS, WITH VARIABLE CLEARANCE.

K. ALL STATEMENTS CONTAINED HERIN; REPRESENT THE CASE AND CLASS, AND ANY ATTEMPTS AT FURTHER UNDERSTANDING; UNDER SUCH CLASS, AND THEORIES SHALL REMAIN SUSPENDED UNDER THE BEHALF OF THE UNITED STATES GOVERNMENTAL AUTHORITIES. NOTED EXPERIMENTAL NATURES; NOT WITHSTANDING ANY CLAIMS TO THE CONTRARY; ALL EFFORTS AND ALL MEANS; ALL TOLERANCES; AND ANY AND ALL CONSTRUCTION DETAILS, SHALL REMAIN TOP SECRET AND THUS ALL DETAILS OF THE STRUCTURE, NATURE AND THE DESIGN OF SAID SECTIONS SHALL HEREBY AND FOREVER REMAIN UNDISCLOSED; AS THE TOP SECRET NATURE OF THESE PROCESSES WILL REMAIN THE PROPERTY AND THE CUSTODIANSHIP OF THE DEPARTMENT OF ENERGY; AS IT IS THEIR NATURE TO BE PRIMA FACI AND TOP SECRET IN PETURITY.

L. SAID KNOWLEDGE OF SAID TOP SECRET NATURES OF EQUIPMENT AND MATERIALS WAS OBTAINED DURING PATENT APPLICANT’S TENURE WITH NORTHROP ADVANCED SYSTEMS DIVISION, PICO RIVERA, CALIFORNIA AS A FACILITIES CONSTRUCTION ENGINEER IN A TOP SECRET CATEGORY; AND AS PRESENT, OBSERVED AND DECLEARED IN THIS DOCUMENT HIS INTENTION TO PRESERE AND PROTECT SUCH TECHNOLOGY AS LONG AS HE SHALL LIVE!

M. THE OVAL CHAMBER OUTSIDE OF THE INITIAL 1700 FEET OF EVIDENTIALLY DISCLOSURE SHALL BE CONSTRUCTED OF STAINLESS STEEL, PLATE COIL, WHICH SHALL BE SIZED AND ORDERED FROM OFF THE SHELF TECHNOLOGY. THE COOLING AGENT IS INITIALLY PROPOSED AS LIQUID NITROGEN, BUT AS THE PHOTOTYPE IS DEVELOPED, OTHER FLUIDS, WITH BETTER THERMODYNAMIC MERITS, MAY BE CONSIDERED AND DEVELOPED TO ENSURE THAT THE ENERGY TRANSFERS AND EFFICIENCIES ARE OPTIMIZED. (STATEMENT DELETED, REVISON 8)


N. IN ADDITION TO THE REQUIREMENTS THUS FAR LISTED, IN THIS TREATISE, THE FOLLOWING SPECIFIC PIECES OF EQUIPMENT, PLANS, AND SPECIFICATIONS LISTED BELOW ARE REQUIRED; SEQUENCES OF OPERATION (NOT INCLUDED HERE) MUST BE DEVELOPED BY THE CONTRACTED AGENCY, PRIVATE COMPANY, ETC AND SUCH ENTITY SHALL AGAIN CONTRACT AND PROVIDE THE MEANS, METHODS, AND PURPOSES TO AN APPROPIATE PLC COMPANY, WHICH HAS EXTENSIVE EXPERIENCE IN THE FIELD.

1. QUARTER SIZE CONSTRUCTION DRAWINGS DEPICTING ANY AND ALL MEASUREMENTS, DESIGN DETAILS AND INTENT, GENERAL NOTES, AND CONDITIONS, PLOT PLANS, AND LOCATIONS, SCALES USED IN BOTH METRIC AND ENGLISH UNITS, AND ANY AND ALL ENGINEERS, AND DESIGNERS, WHO HAVE PLACED ANY AND ALL INFORMATION ON EACH AND EVERY INDEPENDENT SHEET.

2. PROVIDE AND SPECIFY EACH AND EVERY COMPONENT, MATERIAL, PIPE SIZE AND FINISH. ALL SECTIONS, COMPONENTS, PACKAGED EQUIPMENT MUST BE LISTED ON EXCEL SPREADSHEETS CLEARLY WITH ADDITONAL NOTES AS REQUIRED BELOW SUCH LISTINGS. ALL SUBMITALS MUST BE PROPERLY ADDRESSED TO “THE ENGINEER” AND MUST RECEIVE PROPER APPROVAL BEFORE PURCHASE.


3. ALL MATERIALS AND COMPONENTS SHALL BE “OFF THE SHELF” AND BE OF THE HIGHEST QUALITY” THE TERM “HIGHEST QUALITY” SHALL BE DETERMINED BY THE ENGINEER OF RECORD; MICHAEL C HECHT PE AND SHALL BE APPROVED BY A COMBINED TEAM OF SCIENTISTS AND ENGINEERS WITH THE EXPERIENCE AND KNOWLEDGE TO MAKE SKILLED DECISIONS.

4. THE MERIT OF THE WORK SHALL BE DETERMINED BY AN EXPERIENCED CONSTRUCTION MANAGEMENT TEAM, WHICH SHALL BE COMPEDITIVELY BID BY EQUAL OPPORTUNITY EMPLOYERS, WITH A HISTORY OF SUCCESS IN THE DESIGN, CONSTUCTION AND IMPLEMENTATION OF NUCLEAR POWER PLANTS.

2. SIMPLIFIED SEQUENCE OF OPERATION
(NOT TO BE USED FOR CONSTRUC TION; BUT FOR CLEARIFICATION PURPOSES ONLY)

1. THE DEUTERIUM / TRITIUM MIX, WHICH WILL BE GENERATED ON SITE, USING LICIENSED TECHNOLOGY, WILL BE STORED IN EPA RATED, DOUBLE WALLED TANKS, WHICH SHALL BE PROVIDED WITH LEAKAGE SENSORS, LEVEL INDICATORS AS REQUIRED, PRESSURE GAUGES, AND LIKE DEVICES TO EFFICIENTLY MONITOR ALL TANK CONDITIONS AND TO INDICATE ALL FAILURE MODES.

2. THE DETEURIUM / TRITIUM MIX PLANT SHAT BE ERECTED WITHIN THE PLANT BOUNDRIES AND SHALL SERVE AS THE CONSITUIENTS OF THE PARTICLE STREAMS USED IN THE FABRICATED CHAMBER WHICH WILL BE ASSEMBLED IN PLACE WITHIN THE PLANT STUCTURE WITH ALL ITEMS REQUIRED FOR CONSTRUCTION INCLUDING THE TWO PERFORATED PLATES, WHICH WILL BE ULTILIZED AS A VEHICLE FOR MANUFACTURING THE 1300 PAIR PARELLEL STREAMS FOR THE COLLISION AND ENERGY RELEASING VEHICLES OF THE FUSION PROCESS.


3. DEUTURIUM / TRITIUM MIX SHALL BE INJECTED AT PRECISE MOMENTS INTO THE FUSION CHAMBER PLENUMS BY PRECISION MODE, HIGH VOLUME, And STAINLESS STEEL CYLINDERS THAT CAN BE ADJUSTED TO VERY PRECISE INJECTION VOLUMES. THE CYLINDERS SHALL BE ELECTRICALLY ACTIVATED, AND SHALL INCLUDE SPECIFIC MONITORING SYSTEMS (NOT LISTED HERE) WHICH WILL CONTINUOUSLY FEED INFORMATION TO THE CONTROL BUILDING ON PROPER FUNCTION, SETTINGS, ETC (INCLUDING VOLUMETRIC DATA).INJECTION VOLUME SETTINGS (MONITORED IN SI UNITS AT STP) SHALL BE ADJUSTABLE IN THE CONTROL BUILDING AND SHALL HAVE AUDIBLE ALARMS AS PRUDENT AND NECESSARY.

4. INTITAL INJECTION VOLUMES SHALL BE CALCULATED TO ASSESS INDEPENDENTLY, ALL MODES OF OPERATION. SUCH PROCESSES SHALL LIMIT THE DEUTURIUM / TRITIUM MIX CONCENTRATION TO VERY LOW LEVELS UNTIL THROUGH TESTING IS COMPLETED. CAREFULL MONITORING OF INNER SHELL TEMPERATURES IS OF PARAMOUNT IMPORTANCE!!


5. AN INDEPENDENTLY CONTROLLED AND INDIVIDUALLY MONITORED (IN THE CONTROL BUILDING) HEATING, VENTILATING AND AIR CONDITIONING SYSTEM, SHALL BE SPECIFIED, PROVIDED AND INSTALLED. SAID SYSTEM MUST INCLUDE FAILURE MODE, CLASSIFIED TECHNOLOGY, WHICH SHALL BE PURCHASED AND INSTALLED BY SAID CONSTRUCTION ENTITY. (PATENT APPLICANT’S KNOWLEDGE OF FAILURE MODE TECHNOLOGY WAS OBTAINED DURING TUNURE AT BLACK AND VEATCH, OVERLAND, KS AS A MECHANICAL ENGINEER WRITING SPECIFICATIONS AS REQUIRED BY THE ATOMIC ENERGY COMMISSION; CONCERNING THE PROPER FILTERING OF RADIOACTIVE MATERIALS FROM TOXIC AIR SUPPLIES.)

6. AN INDEPENDENTLY CONTROLLED AND MONITORED REFRIGERATION SYSTEM WITH TWO BACK UP SYSTEMS SHALL BE PURCHASED AND EMPLOYED TO COOL THE HYDROGEN STOCK, DEUTURIUM / TRITIUM MIX STOCK, LIQUID OXYGEN STOCK, AND NITROGEN STOCK AND MAINTAIN ALL SAID PRODUCTS AT STP.


7. THE HYDROGEN STOCK WITH ALL INCLUDED ISOTOPES, SHALL BE GENERATED WITHIN THE REQUIRED HYDROGEN PLANT, WITHIN THE FUSION PLANT BOUNDRIES.

8. THE FUSION PLANT MUST BE WHOLELY BE DESIGNED, CONSTRUCTED AND MONITORED WITH THE DAY BY DAY PROGRESS OF CONSTRUCTION. REPORTS, DAILY LOGS, ETC MUST BE SUBMITED BY THE END OF EACH SHIFT.


9. SAID FUSION PLANT SHALL INCLUDE ALL MEASURES AND ALL SIGNALING DEVICES, AS REQUIRED, IN A CONTINUOUS BATCH PROCESS, TO GENERATE, STORE, AND DISTRIBUTE SAID PRODUCTS, NOT ONLY AS FEED STOCK TO FEED THE BATCH REACTION PROCESS, BUT ALSO TO FEED THE UTILITY REQUIRED HYDROGEN DISTRIBUTION SYSTEM, WHICH WILL, IN TIME INVOLVE THE CONSTRUCTION OF THOUSANDS OF MILES OF PIPE, AND NEW COMPRESSING STATIONS (NOT LISTED HERE)

10. VENTILATION;

ALL MEANS, CALCULATION, AND DESIGN MUST BE DETAILED FOR A PROPER AND SAFE EVACUATION SYSTEM. IN THE EVENT OF SERIOUS LEAKS, IN ANY SYSTEM; WHERE EXPLOSIVE GAS IS PRESENT, ALARMS MUST BE PLACED, BOTH VISUALLY, AND AUDIO WISE, AND EMERGENCY (SPARK PROOF) EXHAUST FANS MUST BE STREGICALLY PLACED TO DILUTE SAID EXPLOSIVE FUMES TO LOW LEVELS SO THAT COMBUSTION CANNOT OCCUR.

11. UPS; BATTERY ROOMS WITH THE LATEST BATTERY TECHNOLOGY (LITHIUM ION) (SEALED) SHALL BE PLACED AT STRATEGIC POINTS, AROUND ALL PLANTS, PROCESSES, AND WITHIN THE CONTROL ROOMS, TO MAINTAIN A MINIMUM OF EIGHT HOURS OF CONTINUOUS OPERATION OF ALL CRITICAL PROCESSES.

12. EMERGENCY GENERATORS, INCLUDING PORTABLE GENERATORS; MUST BE AVAILABLE, AND SHALL BE CONNECTED AT CRITICAL JUNCTION POINTS. TRANSFER SWITCHES (MANUAL) SHALL BE PROVIDED AT EACH CONNECTION POINT AND A SMOOTH TRANSITION OF ELECTRICAL POWER SOURCE MUST BE DESIGNED INTO EACH SYSTEM.


13. ALL CONTROLS, PLACEMENTS, OPERATIONS IN PROGRESS SHALL BE DESIGNED SO THAT ORDERLY SHUTDOWN CAN OCCUR IN THE EVENT OF AN ACCIDENT, OR INTENTIONAL SABBATOGE.

14. ALL LIGHTING IN THE CONTROL BUILDING MUST BE FLOURESENT, WITH ENERGY EFFICIENT BALLASTS. ALL LIGHTING MUST USE THE LATEST MOST EFFICIENT TECHNOLOGY.


15. HVAC DESIGN IN ALL AREAS SHALL SPECIFY THE HIGHEST ENERGY EFFICIENCY STANDARD, CURRENTLY IN THE FIELD, AT THE TIME OF THE AWARDING OF THE CONTRACT.

16. MAINTENANCE MANUALS MUST BE PREPARED AND DISTRIBUTED TO THE RESPONSIBLE PARTIES ON ALL PIECES OF EQUIPMENT, INCLUDING, REQUIREMENTS OF PERIODIC MAINTENANCE, UPKEEP, AND REPAIR.


17. SAID PLANT CONTRACTOR MUST PERFORM MANDATED TRAINING ON ALL SYSTEMS, EQUIPMENT, PLCS, AND ANY AND ALL OTHER DEVICES NOT LISTED HERE, FOR THE PROPER AND FULL OPERATION OF THE FUSION ACCELERATOR PLANT.

18. LAST BUT NOT LEAST; THIS FUSION PLANT IS A BATCH PROCESS PLANT. CAREFULLY PLACED, A SPECIFIC AMOUNT OF DEUTURIUM TRITIUM MIX WILL BE INJECTED DIRECTLY IN THE CENTER WHERE THE TWO PLENUMS LIE. THESE PLENUMS, BETWEEN THE TWO HIGH TOLERANCE PERFORATION PLATES WILL CONTROL THE APPLICATION AND WILL ESTABLISH THE TIMING AND CONTROL NEEDED TO ESTABLISH; IN THE TWO DIFFERENT FLOW DIRECTIONS; THE TWO THOUSAND STREAMS NEEDED (PARTICLE SIZE IN INVENTION TO BE DETERMINED BY EXPERIMENTATION) WITHIN THE CHAMBER... THE PARTICLES WILL BE ACCELERATED AND WILL COLLIDE AT A SPECIFIC POINTS IN THE CHAMBER TO CREATE THE CONDITIONS FOR FUSION.

THE BURST RATE IS OF COURSE IN THE FRACTIONS OF A SECOND, BUT THIS WILL BE A BATCH PROCESS. APROXIMATELY HALF OF A SECOND AFTER AN INJECTION OF THE DEUTEIUM / TRITIUM MIX, THE NEXT INJECTION WILL OCCUR, BUT THE COMBUSTION POINT (IF YOU WILL) WILL SHIFT TO THE OTHER SIDE OF THE OVAL IN THE CHAMBER.

THE GENERAL IDEA IS TO GENERATE OVER AND OVER AGAIN, NIGHT AND DAY; FRACTIONAL TIME CONSTANT MEASURES, WHICH MOST SCIENTISTS ARE AWARE OF. SO THE RESULT??? BATCH FUSION; CONTROLLABLE AND MAINTAINABLE AND THE SYSTEM WILL PRODUCE LOTS AND LOTS OF ENERGY, AS THE COLLISON POINT REVOLVES AROUND THE ENTIRE TRACK!!!

AS SUBMITED, VERILY AND IN DUE COURSE, THE RESPONSIBILITY AND ORGANIZATION AS NOTED HERE, SHALL BE NOTED AND ADHERRED TO, THUS AS THIS SYSTEM IS EXPLORED AND NOTATED ALL VISIONS AND THUS ALL REPUTATION SHALL BE AS NOTED AND SHALL IN PETUITY BE TERMED AS PRIMA FACI WITH REGARD TO ALL NOTES AND CONDITIONS WHICH SHALL HEREBY FREQUENTLY BE REFERRED TO AS THE ORIGINAL PATENT; THUS AS IN OTHER LOCATIONS IN THIS DOCUMENT, ALL TRUST MUST REMAIN IN THE HANDS OF THE PATENT OWNER, THUS ALL REMAINING MERRIT AND THUS IN PETUITY ALL CLAIMS BOTH FORIGIGN AND DOMESTIC SHALL HEREBY BE INFORCED INDEFINITELY.

I THEREBY APPROVE AS SUBMITTED SAID INVENTION AS FULLY AND ARGUABLABLY COMPLETE AND SAID INVENTION SHALL REST WITHIN AND IN PETUITY AS SUCH.


TRULY YOURS,

MICHAEL C HECHT PE (PROFESSIONAL ENGINEER; FEES NOT CURRENT, BUT ASSESSIBLE)










































APPENDIX 1

FURTHER DESCRIPTION

PARTICLE ACCELERATION AND TECHNIQUES FOR THE COMBUSTION AND THE IGNITION OF THE PRIMARY / SECONDARY REACTIONS.

1. ALMOST ALL THE REMAINING FUSION PROCESSES RELY ON TREMENDOUS PRESSURES TO RENDER ALL POSSIBLE QUANITIES SUBSEQUENT TO PROPER IGNITION. OUR PROCESS HERE IS QUITE DIFFERENT. A KNOWN QUANITITY; AS WAS MENTIONED IN SECTION 1, SHALL BE LINEARLY ACCERATED WITH KNOWN MAGNETIC AND/OR ELECTROSTATIC METHODS. THE PARTICLE STREAM ON THE LEFT SIDE OF THE OVAL IN INITIAL TESTS SHALL BE ACCELERATED TO A VELOCITY ABOVE 1.6X10EE8 METERS/SEC. THE VELOCITY OF THE COHERANT STREAM WHICH IS ACCELERATED ON THE OTHER SIDE OF THE OVAL SHALL BE ABOVE 1.4X10EE8 METERS/SEC INSURING A ROTATING CLOCKWISE COLLISON POINT AT THE INSTANT OF IMPACT.

2. A SOURCE OF OXYGEN STOCK SHALL BE COLLECTED FROM THE HYDROGEN GENERATION PLANT AND SHALL BE STORED IN A SIMULAR MANNER AS THE HYDROGEN STOCK IN DOUBLE WALLED TANKS WITH THE APPROPIATE SAFETY MONITORS AND ALARMS. A COMPRESSOR WITH 2 BACK UPS OF SAME SIZE SHALL BE LOCATED DIRECTLY ADJACENT TO THE OXYGEN TANKS. THE SUBJECT COMPRESSORS MUST BE SIZED, INITIALLY; WHICH IS SUMMERIZED BELOW;

OXYGEN; CFM; 210 PRESSURE; 275 PSI (AT STP)

3. THE OXYGEN SHALL ULTILIZE 4” STAINLESS STEEL TUBING WITH SLEG-LOCK FITTINGS.

4. A SOURCE OF HYDROGEN STOCK, AS MENTIONED ELSEWHERE IN THIS DOCUMENT, MUST BE EQUIPPED WITH A COMPRESSOR WITH 2 BACKUPS OF SAME SIZE, LOCATED DIRECTLY ADJACENT TO THE HYDROGEN TANKS. THE SUBJECT HYDROGEN COMPRESSORS MUST BE SIZED ACCORDING TO THE NEED WHICH IS SUMMERIZED BELOW;

HYDROGEN; CFM; 360 PRESSURE; 350 PSI (AT STP)

5. THE HYDROGEN SUPPLY SHALL ULTILIZE 4” STAINLESS STEEL TUBING WITH SLEG LOCK FITTINGS.

6. FUCNCTIONAL USE

a. ALL OXYGEN AND HYDROGEN PIPING SHALL BE SUPPORTED IN SADDLES.

b. INSULATE ALL OXYGEN AND HYDROGEN PIPING TO LIMIT CONDENSATION OF PIPING TO A NEGLIABLE AMOUNT.


c. AT EACH POINT OF IGNITION, PLANNED, EQUALLY SPACED ON THE LINEAR PORTIONS OF THE OVAL, STOCKIAMETRIC QUANITIES OF HYDROGEN AND OXYGEN WILL BE MIXED (DELETED SENTENCE, REVISION 8)AND INJECTED AT HIGH PRESSURES (275 PSI). THE ACTUAL NOZZLE PRESSURES SHALL BE REVIEWED AND ADJUSTMENTS SHALL BE MADE FROM FIELD MEASUREMENTS AND MANUFACTURER’S DATA. AN IGNITION DEVICE, SIMULAR TO A SPARK PLUG, SHALL IGNITE THE OXYGEN / HYDROGEN MIX AT THE PROPER MOMENT, THUS CREATING A FLOOD OF HIGH TEMPERTURE PLASMA (5000 F) AT THE MOMENT OF IMPACT.

d. THE ORANGE PLUME, TECHNICALLY CANNOT BE PREDICTED WITH ALL CERTAINTY, THUS THE EXACT QUANITIES OF THE CONSITUENTS OF THE COMBUSTANTS SHALL BE EXPERIMENTALLY DETERMINED. DIAMETERS OF THE PIPE, NON WITHSTANDING ALL MEASURES, TEMPERATURES AND ADJACENT SUPPORTING STRUCTURE MUST BE CAREFULLY PLACED TO AVOID FLAME DAMAGE.

e. NOZZLES MOUNTED TO INNER CHAMBER FOR COMBUSTION MUST BE MOUNTED AT THE CENTER OF EACH ARC ON THE OPPOSITE SIDES OF THE OVAL CROSSSECTION. THEREFORE 2 ARE REQUIRED VERY CLOSE, TO EACH OF THE TWO INITIAL POINTS OF IMPACT. ADJUSTMENTS SHALL BE FABRICATED IN THE FIELD SO THAT THE POINTS OF IMPACT ARE COMPLETELY SUBMERGED IN FLAME.

f. SUCH SYSTEM AS IDENTIFIED AS SUCH IN THE ABOVE PARAGRAPHS SHALL BE EXPERIMENTALLY DETERMINED BEFORE CONSTRUCTION. CONSTRUCTION METHODS SHALL BE CAREFULLY MONITORED IN THE FIELD. BASED ON THE EXPERIMENTAL NATURE OF THIS CLASS OF IGNITION, STANDARD METHODS OF IGNITION MAY BE USED IE; LASER OR MICROWAVE, ETC IF FLAME SYSTEM IS PROVEN TO BE AN UNWORKABLE SYSTEM WITHIN THE LAB OR IF AN ALTERNATIVE METHOD CAN PROVIDE BETTER RESULTS.





APPENDIX 2

MEANS, METHODS, SIZES, CALCULATION METHODS AND EMPIRICAL ACCULMALATION OF DATA

I. ADDITIONS TO ESTABLISH THE DESIGN / BUILD PROCESS IN AN ORDERLY MANNER

1. ALL NOTES, MANNER OF CALCULATION, THEORIES AND SAMPLE DATA ARE SUBJECT TO CHANGE FOLLOWING PRECISE DESIGN TECHNIQUES. PATENT THAT HAS BEEN APPLIED FOR IS BASED ON A SYSTEM APPROACH WITH THE NUMERICAL VALUES ONLY APPROXIMATED.

2 DURING THE DESIGN PHASE, ALL INITIAL VALUES WILL BE REASSESSED, THUS THE FINAL DIMENSIONS, QUANITIES, VELOCITIES AND SUCH WILL CHANGE.
3
THE TYPICAL ARRANGEMENTS OF THE SYSTEM WILL REMAIN AS PATENTED, BUT AS THE DESIGN PROGRESSES, MANY OF THE VALUES OBTAINED IN THE ORIGINAL PATENT WILL BE DEEMED PRIMA FACI AND THUS MANY OF THE VALUES ACTUALLY USED IN THE CONSTRUCTION WILL BE DEEMED ENPIRICAL IN SCOPE AND THUS JUST THE SYSTEM SHALL BE DEEMED VIABLE IN THIS PATENT.

II

1 WHERE THEORIES CAN NOT BE PROVEN AND CONCRETE NUMBERS CANNOT BE OBTAINED DUE TO THE FACT THAT SOME OR ALL OF THESE PROCESSES WILL BE STATE OF THE ART, “THE ENGINEER” SHALL; WITH PROMISE OF FORSIGHT, RECOMMEND AND BE RESPONSIBLE FOR THE INITIAL QUANITY OR QUANITIES IN QUESTION.

II TESTING

1. TESTING SHALL BE AS SPECIFIED BY THE ENGINEER; AND SHALL BEGIN BY INJECTING MINUTE QUANITIES OF DEUTURIUM / TRITIUM MIX, FAR FEWER THEN EXPECTED, THUS WITH EACH TEST ALL MEASUREMENTS AND OBSERVATIONS AND THUS ALL METHODS, AND MANNERS OF EXECUTION OF SAID MACHINE SHALL BE OBSERVED. QUANITIES SHALL BE INCREASED, TEST BY TEST AND ALL OBSERVATIONS SHALL BE CAREFULLY MONITORED. ADJUSTMENTS TO EQUIPMENT SHALL BE INSTALLED AND CONSTRUCTED ON THE SITE AS OBVIOUS ALTERATIONS ARE DETERMINED.

II PROPORTIONAL SIZING

1. MACHINE SHALL BE INSTALLED AND CONSTRUCTED; “FULL SIZE”, WITH THE ACCEPTANCE THAT SUCH DECISIONS MAY LEAD TO DRASTIC CHANGES IN THE FIELD IN THE FULL KNOWLEDGE OF THE AUTHORITY HAVING THE PATENT RIGHTS.

2. IT SHALL BE ACCNOWLEDGED BY SAID AUTHORITY THAT INITIAL ESTIMATES OF THE COST OF SAID FACILITY SHALL BE MARKED AND ADJUSTED AS REQUIRED IN ORDER TO ADJUST ALL VARIBLES, AS REQUIRED; TOTAL MERITS AND ALL COSTS BENEFICIAL TO THE AUTHORITY HAVING JUSRISTICTION.


3. THUS THIS AGREEMENT, IN FULL; WITH AT TIMES, QUANITIES UNKNOWN, SHALL RENDER TO THE GOVERNMENT OF THE UNITED STATES OF AMERICA; IN PERTUITY, THE RIGHTS, AGREEMENTS AND THE RESPONSIBILTY OF SEEING THE DESIGN, CONSTRUCTION AND THE TESTING AS WELL AS THE RENOVATION OF SAID INVENTION AT COST WITH NO PENALTY TO ANY AND ALL PARTIES INVOLVED IN SAID DESIGN, CONSTRUCTION AND THUS NO GRIVENCE SHALL BE APPLIED.





















APPENDIX 3

SEQUENCE OF OPERATONS OF THE BEGINNING OF THE COLLISON CYCLE

1. BY INJECTION, THE TWO INDEPENDENT STREAMS WILL BE INITIATED THROUGH TWO SEPARATE, INDIVIDUAL CYLINDERS WHICH WILL DISCHARGE INTO TWO INDEPENDENT PLENUMS,WHICH WILL IN TURN DISCHARGE THROUGH TWO INDEPENDENT PERFORATED PLATES, BOTH OF WHICH HAVE FURTHER DESCRIPTION ELSEWHERE IN THIS DOCMENT. THIS PROCESS WILL BEGIN WITH THE INJECTION OF DEUTERIUM / TRITIUM MIX ON SIDE 2 AS SHOWN ON THE ATTACHED SCHEMATIC DIAGRAM. A TIMED DELAY SHALL BE PROVIDED; AND SIDE 1 WILL INJECT AT A PREDETERMINED PERIOD OF TIME SO THAT THE INITIAL COLLISION WILL OCCUR AT SIDE 1, 200 FEET ABOVE THE END OF THE ARCH IN THE INERT PORTION OF THE CHAMBER AT THE SAME TIME OF THE COLLISON, THE VACUUM PUMP SLIDE GATES, SPECIFICALLY MANUFACTURED TO COMPLETELY SEAL, WILL OPEN ON THE NUMBER 2 SIDE AS SHOWN ON THE SUPPLIED DIAGRAM.

2. THUS, AS MENTIONED AND FULLY MARKED ON ATTACHED DIAGRAM, A SINGLE BATCH REACTION OCCURS. THE ENTIRE BATCH OF PARTICLES ON THE LEFT SIDE, SIDE 1, AND THE ENTIRE BATCH OF PARTICLES, CAREFULLY MANAGED IN A SQUARE MATRIX, IMMEDIATELY AFTER THE BEGINNING OF THE REACTION, ON SIDE TWO, WILL BE MAGNETICALLY AND / OR ELECTROSTATICALLY ACCELERATED IN OPPOSITE DIRECTIONS. IN THE DESIGN PHASE, THE OPERATION OF THE MAGNETIC COILS AND THE ELECTROSTATIC GRIDS, SHALL BE CAREFULLY EVALUATED, SO THAT THE COLLISION POINT WILL MOVE CLOCKWISE, AS THE TUNNEL, AT THE SAME TIME IS BEING SWEPT CLEAN OF PARTICLES FROM THE VACUUM PUMPS MOUNTED ON SIDE 2

3. THE MOMENT OF TERMINATION OF THE BASE REACTION MUST BE SET 200 FEET HIGHER THEN THE POSITION OF THE BAFFLE PLATE ON SIDE 2. THUS, AT THE MOMENT OF COLLISION, ALREADY A PORT WILL HAVE OPENED TO EVACUATE ANY PRODUCTS OF COMBUSTION AND ANY FUSION REACTION PRODUCTS ON SIDE 2

4. IGNITION PROCESSES, ABOVE THE YOKE SHALL BE CAREFULLY MONITORED, USING TRADITITONAL ESTABLISHED METHODS WITH MINORITY SETTINGS AND SHALL BEGIN SAID PROCESSES ACROSS THE SPECTRUM AS THE REAL STUDIES SHALL SOON OBSERVE.

5. THIS PROCESS SHALL FROM THIS DAY FORWARD SHALL BE NOTED AS THE “HECHT FRACTIONAL BATCH SINGLE PLANT SYSTEM,” AND SHALL BE NOTED IN THE RECORD AS BEING THE FIRST UNIQUE BATCH SYSTEM EVER PROPOSED IN THE HISTORY OF MANKIND; THUS, IN EVERY JURISDICTION, COLLEGE, OR UNIVERSITY AND NEWS RELEASE, SAID SYSTEM SHALL BE RESPECTED, TOLERATED, RECCOMENDED, AND THUS ALL TARRIFS, ALL LAWS, ALL REGULATORY AUTHORITIES SHALL IN PETUITY RECOGNIZE, ABRIDGE, AND MATCH ALL PATENTS AND THUS, WITH EQUALIMITY BEFORE ALL LAWS OF ALL JURISDICTIONS SHALL HEREBY RECOGNIZE AND APPROPIATE ALL SUMS AND RENDER TO THE INVENTOR, MICHAEL C HECHT PE, AND ALL OTHER AUTHORITIES HAVING JURISDICTION, ALL SAID ITEMS IN POST HASTE; AS IN SAID ARTICLES IN GOOD FAITH, THUS SAID INVENTION OF MERIT SHALL BE A BLESSING FOR ALL OF MANKIND.


GOD BLESS AMERICA!





MICHAEL C HECHT PE

(LICIENSED BY EXAMINATION IN BOTH MECHANICAL AND ELECTRICAL ENGINEERING)


















ADDENDUM 1

APPEARANCES TO THE CONTRARY; CONDITIONS EXIST WHERE HIGH COLLISON TEMPERATURES CAN ONLY; PROFIT FROM UNDISCLOSED MATERIALS, AS ELSEWHERE SPELLED OUT IN THIS DOCUMENT, NON WITHSTANDING ANY AND ALL ARGUMENTS TO THE CONTRARY; SUBSEQUENTLY UNTIL FURTHER FAULT AND INDICATES A ALTERNATIVE; OR IF COEXISTING, THERE ARE OTHER IDEAS OF EQUAL OR GREATER MERIT; THIS INVENTION SHALL HEREBY EXIST FUNDAMENTALLY, AS SUCH MERIT AND CONDITIONS EXIST, THUS TO THE CONTRARY OF ANY OR ALL CLAIMS , ALL MEASURES AND ALL EVENTS OF EQUAL MEASURES, THUS ANY AND ALL APPROACHES AND MEASURES, WITHOUT MERIT, MUST COMBINE WITHIN THEIR TECHNIQUES IN EQUAL FASHION; AS WHENCE, ALL WHO MAINTAIN AND WHO SHALL WITNESS SAID EVENTS, WITHOUT VENTURE, AND WITHOUT EVIDENCERY BENEFIT, CANNOT, HEREBY INVESTIGATE, TEST, MEASURE OR WITHSTAND ANY AND ALL NATURES, THUS THE FREQUENCY AND THE TRUST MUST BE MAINTAINED AND ANY AND ALL DISTINCTIONS; AND THUS, ANY AND ALL SAID MEASURES OF SAID INVENTION SHALL BE DEEMED PRIMA FACI, IN ALL THOUGHT AND ACTION, AND THUS THE EVIDENCE SHALL BE WARRANTED AS “PROVEN” AND ALL THOUGHTS AND MEASURES SHALL BE RESPECTED AS “WITHSTANDING”, ANY AND ALL THOUGHT AS THOUGH ANY AND ALL MEASURES, NON WITHSTANDING, ALL PURPOSES AND ALL CLAIMS; AND THUS, THE INFREQUENT CLAIMS SHALL HAVE NO PURPOSE AND NO CLAIM AND THUS ANY AND ALL ARTIFICTS SHALL HAVE NO MERIT AND THUS ANY AND ALL MERITS SHALL ONLY BE ADDRESSED WITHIN THE DESIGN PHASE; AND THUS, ANY AND ALL PURPOSES, INVENTIONS, AND MERITS SHALL BE IN PETUITY, SHALL BE OF THE NATURE AND THE TRUST OF SAID INVENTOR, AND SHALL GAIN GROUND ONLY AS THE INTENTION OF THIS PATENT IS PROVEN ON THE GROUND, AND THUS EACH AND EVERY CLAIM OF FAULT SHALL BE DEEMED “AT FAULT” AND STRICKEN FROM SAID PATENT, AND THUS ANY AND ALL DESIGN CHANGES, NON WITHSTANDING ANY AND ALL CLAIMS; SHALL THUS, BE PROVEN THROUGH EMPIRICAL REASONING; AND IN THE RESPECTIVE LABORITORIES, AND THUS ANY BASIS AND ANY DISTINCTION, AND THUS ANY AND ALL APPROVALS CERTAINLY CANNOT AND WILL NOT EXHIBIT SUCH CLAIMS IN PETUITY.






I THE FOLLOWING ITEMS, NOT INCLUDED THERIN, BUT ABSOLUTELY IMPERATIVE, SHALL BE ADHERED TO, THUS ALL FUNCTION AND MERIT AND THUS EVERY AND ALL DEVICES SHALL HAVE MERIT AND THUS, THE FUNCTIONALITY, AND THUS EVERY AND ALL CODICIL MUST BE PRIMA FACI AND THUS EACH AND EVERY MERIT SHALL BE NOTED, AND SUCH MERIT SHALL BE INCLUDED AND THUS EVERY AND ALL MOTIVES; THUS FOCUSED, AND BELONGING TO SAID PROJECT, SHALL RECEIVE SUCH MERIT AND THUS, ENTIRE INVENTION SHALL EXIST AND SHALL RECEIVE ALL MERITS AND THUS ANY AND ALL BELONGINGS, THUS SAID IN THIS APPLICATION; THAT ANY, AND EVERY, OTHER INVENTION TO THE CONTRARY, SHALL BE STRICKEN FROM ANY AND EVERY RESPONSIBILITY, AND THUS SAID INVENTION WILL SIGNIFY THAT SAID PATENT DECLARES NO DEFICIENCIES, AND THUS SAID INVENTION SHALL ALWAYS FOLLOW ALL CODICILS AND BELIEFS, AND THUS ANY AND ALL ITEMS SHALL BE “PART AND PARCEL”, AND THERE SHALL BE NO GIFTS OR MERITS, THUS ANY AND ALL MERITS, PRIMA FACI EVIDENCE INCLUDED ,SHALL CARRY AND SHOW ANY AND ALL CONCERNS; THUS, ALL EVIDENCE TO THE CONTRARY, THE INVENTOR, MICHAEL C HECHT PE, AND HIS HEIRS, SHALL NOT BE REQUIRED TO SHOW ANY EVIDENCE AND ALL CONCEPTS BROUGHT TO THE APPEARANCE OF ANY AND ALL HEARINGS, AS WELL AS ALL REMARKS TO THE CONTRARY SHALL BE DEEMED, CARELESS AND REJECTED, THUS EVERY, AND IN TOTAL, ALL SUBJECTS PERTAINING TO SAID PROJECT; THUS ALL REMARKS OR CODICILS, SHALL HEREBY BE NOTED AS RECENT; AND THEREBY, ANY AND ALL PARAGRAPHS OF SAID PATENT, SHALL HAVE MERIT AND THUS; THE FOLLOWING PARAGRAPHS APPLY;

1. HYDROGEN OXYGEN MIX FOR “FLAME” MUST BE PURE STOICHIOMETRIC MIXTURE
2. HTSC, HIGH TEMPERATURE, SUPER CONDUCTING, TRANSFORMERS AND TRANSMISSION LINES ARE REQUIRED WITHIN PLANT BOUNDRIES
3. HEATING AND CURRENT DRIVE WITH HELIUM COOLING IS REQUIRED ONLY IF TESTING INDICATES THAT SUCH PRODUCTS ARE NECESSARY, IN LIEU OF LIQUID NITROGEN COOLING.
4. ORIFICE SIZE SHALL BE DETERMINED EXPERIMENTALLY IN THE FIELD. CENTER TO CENTER OF EACH ORIFICE SHALL BE 2 INCHES.
5. LAWS OF MOMENTUM INDICATE THAT THE “FLAME” VELOCITIES WILL NOT BE LARGER THEN THE SPEED OF SOUND, WHILE THE HYDROGEN ISOTOPES, TRAVELING AT CLOSE TO THE SPEED OF LIGHT (MV MEASUREMENTS AND CALCULATIONS ARE WELL KNOWN); WILL BE ENERGETIC ENOUGH TO KEEP THEIR RESPECTIVE PATHS CLEAR AND THUS SINCE SUCH MOMENTUMS, WILL BE SO MUCH MUCH GREATER THEN FLAME REACTANTS PER THE ABOVE FACTS, THAT DESPITE THE CLOSE PROXIMITY OF THE; H20, 02 AND H2 MOLECULE’S, AND SINCE THEIR VELOCITIES WILL BE CLOSE TO THE SPEED OF SOUND, THAT IT SHALL BE DEEMED, “PRIMA FACI” THAT SUCH PARTICLES SHALL NOT INTERFER WITH THE HIGH SPEED PARTICLE STREAM FLOW.
6. INITIAL COLLISION VELOCITIES IN THE ROTATING FIELD WILL BE ACCELERATED TO 1.6 TIMES TEN TO THE EIGHT METERS PER SECOND (ROTATING FROM THE LEFT SIDE)
7. PERIMETER OF ACCELERATOR SYSTEM SHALL BE GREATER THEN 25000 FEET. THE “OVAL” OR “TRACK” SHALL HAVE A 1.2 MILE RADIUS AT THE END OF THE STRAIGHT SECTIONS OF TRACK. THE INERT AREA, COMPOSED OF HIGHLY CLASSIFED MATERIALS SHALL STEM FROM A POINT 45 DEGREES DOWN FROM THE TOP OF THE OVAL, AND SHALL EXTEND FORWARD OF THAT TO RENDER A TOTAL LENGTH OF 1700 FEET OF TUNNEL THE COLLISON POINTS ARE INITIALLY SET AT 200 FEET FROM THE START OF THE STRAIGT CHAMBER AND AS IT IS NECESSARY, AND AS THE PHYSICISTS DEEM IT, AN ADJUSTMENT MIGHT HAVE TO BE MADE TO THIS INTIAL ACESSMENT.
8. INITIAL VELOCITIES ON RIGHT SIDE WILL BE ACCELERATED TO 1.4 TIMES TEN TO THE EIGHT METERS PER SECOND, WHILE PARTICLE STREAMS ON THE LEFT SIDE SHALL BE ACCELERATED, AS MENTIONED ABOVE, TO 1.6 TIMES TEN TO THE EIGHT METERS PER SECOND, PARTICLE STREAMS (1300 IN EACH BATCH) SHALL BE TIMED, SO THAT THE INITIAL COLLISION ON THE LEFT SIDE SHALL BE WITHIN THE INERT COLLISION PART OF THE TUNNEL MOUNTED ON EACH SIDE OF THE OVAL, WHICH REPRESENTS THE FIRST 1700 FEET ON EACH SIDE OF THE CHAMBER WALL, WITH THE COLLISION POINT APPROXIMATED AT 200 FEET AFTER THE START OF THE INERT PART OF THE CHAMBER, ON EACH SIDE.
9. ALL SUCH VEHICLES, AS SUCH, AND ALL SUCH MOTIONS AROUND THE PERIMETER SHALL HENCEFORTH BE DESIGNATED AS "THE TRACK" SAID TRACK SHALL EMPLOY ALL MEANS OF ACCELERATION INCLUDING MAGNETIC AND ELECTROSTATIC. ELECTROSTATIC MEANS SHALL BE ACCOMPLISHED ONLY OUTSIDE OF INITIAL COLLISION SITES. MATERIALS OF CONSTRUCTION SHALL BE CONSTRUCTED OF 1 - 1/2 SQUARE INCH 304 STAINLESS STEEL TUBING. INTERSTITIAL SPACES OF SAID TUBING SHALL BE COOLED BY CHOSEN FLUID AS DEEDED NECESSARY IN THE HEAT EXCHANGING PORTIONS OF SAID TRACK.
10. AN EVALUATION SHALL BE COMPLETED COMPARING HEAT TRANSFER SURFACES REQUIRED ON THE SURFACE, WHICH SHALL REJECT THE WASTE HEAT. ALL SUCH SURFACES SHALL BE DEEMED IDENTICAL AND SHALL BE WITHIN THE SITE BOUNDARIES OF USE AND SHALL INCLUDE LARGE WATER COOLING TOWERS AND AS AN ALTERNATIVE DRY COOLERS... IT MUST BE MENTIONED IN THIS ARTICLE THAT THERE IS EMPIRICAL EVIDENCE THAT
DRY COOLERS HAVE SIGNIFICANTLY LESS MAINTENANCE. DRY COOLERS SHALL BE EVALUATED WITH VARIABLE SPEED FANS, FOR ENERGY EFFICIENCY.





















ADDENDUM 2

(SUPERCEEDS ALL PREVIOUS DISCLOSEURES REGARDING EVIDENTURY CIRCUMSTANCES OCCURING AT THE COLLISON POINTS.)

A POSITION PAPER CONCERNING THE CREATION AND ACTIONS NEEDED TO PROVIDE A CONTINUOUS BATCH FUSION REACTION SYSTEM

This new invention which was submitted to the US Patent office in October of 2008 was initially developed to investigate through existing processes if a viable process could be developed which could provide repeatable collisions, with each set of collisions providing usable fusion energy. As I lay no claim to being a particle physicist and lay no claim to having access to any laboratory, my only claim is to a power plant system, which should create substantial amounts of energy. In the lab, all items in question will require further research and development. It is not my purpose to claim that every process that is talked about in the patent is viable, but only that there may more then one way to skin a cat, so the whole purpose of said invention of note is to provide to the many many scientists, and engineers, sufficient claims to “peak “ their interest.

I read a treatise on fusion energy. This particular process indicated that a 3 megawatt burst (I believe it was less then .1 second) was possible. At the time, as I wanted to propose a system that can produce a peak 6000 megawatt collision, I decided to propose perforated plates, each plate carefully lined up with the other. The idea was to create very high precision particle streams that could be accelerated in the chamber. Again since I am not a particle physics guy, I am not educated in the amount of particle density and energy that is needed to sustain for even a small amount of time a fusion condition.

As time went on, I decided that it made more sense if I took my 2000 particle streams and strongly condensed them right at the collision site or sites. I knew from my mechanical engineering studies that the collision point would be similar to a venturi apparatus and that the velocities would be sky high in the “pinched” areas and that the temperatures would go through the roof.

I am still envisioning very carefully timed and measured batches of isotopes. As for an example, the particle streams on the left side of the oval would be accelerated to a much greater velocity then the particle streams that are emitted from the right side. This will cause a gradient where the average velocity will be substantial and will be in the clockwise direction. The expectation is to create the first collision on the left side of the oval in the “protected area” of the chamber which is defined as a highly classified top secret material, well known to the material scientists that worked with it in the early eighties and used in aerospace development. Unfortunately the exact nature and function is only known within that realm of the Department of Defense with sufficient clearance. But it is with my awareness of this material and its conditions of its use that I am aware of the tremendous temperatures that this material can resist.

The purpose of the classified material is to sustain without damage the initial collision point; as at that point in the structure, the velocities of the particles will not be high enough and it is expected that in that area, the relatively slow particles, with their extremely high temperatures would damage or destroy the heat transfer surfaces. Extremely high acceleration is mandatory in the classified parts of the tunnel and it is necessary to get the velocities in the particle streams as high as it is necessary, so that the particle streams do not damage the stainless steel heat transfer surfaces. I do not, of course, know what particle speeds I need to protect the heat exchange surfaces, but to me, if the velocities are high enough then the tens of millions of degrees will pass by the heat transfer surfaces so fast that there will be no damage to them.

The main chamber has to be designed so that each reaction has enough time to “spin” around the track to the point at which the fusion “burst” goes out.

I have not completed a careful study of the necessary vacuum pumps, but I think that we might be able to have many bursts in a row, before the particle count within the tunnel renders ignition impossible.

It is my expectation that the first collision point, will, as stated above be on the left side and with great velocity will go out in the inert portion on the other side of the oval. At that point another “batch” of deuterium – tritium particles will be sent into the tunnel, carefully timed and measured, but this time, the particles that are emitted on the left of the oval will have a slower velocity then the particles on the right, and the point of collision will occur on the right side of the oval in the classified area which is similar in scope to the left side classified area.

I envision a grandfather clock system, where the light spins first left to right and then returns right to left and I expect since the total reaction is a fraction of a second that the human eye certainly will not be able to follow it.

I do understand that what I am proposing involves horrendous temperatures and energy releases and I expect that if this machine is built that we will have to “tread lightly” as we slowly ratchet up the batches and the timing, Even so, at present, I think that my idea deserves attention and it is my dream (of course) that we build a system such as I describe. I understand and I too am very hopeful for the “best way” to be developed, but I just have to say in passing that si

Michael C Hecht PE (Missouri Bourbon)
GEORGETOWN, TX

If you think this post is inappropriate, please click here.

A NEW US PATENT

I HAVE COPIES OF THE PATENT I MENTION FROM TIME TO TIME ON A VIABLE FUSION BATCH PROCESS WHICH YOU ARE WELCOME TO GET A COPY OF.
BEST

MICHAEL C HECHT PE

ATTACHED SYOPSIS;

A POSITION PAPER CONCERNING THE CREATION AND ACTIONS NEEDED TO PROVIDE A CONTINUOUS BATCH FUSION REACTION SYSTEM

This new invention which was submitted to the US Patent office in October of 2008 was initially developed to investigate through existing processes if a viable process could be developed which could provide repeatable collisions, with each set of collisions providing usable fusion energy. As I lay no claim to being a particle physicist and lay no claim to having access to any laboratory, my only claim is to a power plant system, which should create substantial amounts of energy. In the lab, all items in question will require further research and development. It is not my purpose to claim that every process that is talked about in the patent is viable, but only that there may more then one way to skin a cat, so the whole purpose of said invention of note is to provide to the many many scientists, and engineers, sufficient claims to “peak “ their interest.

I read a treatise on fusion energy. This particular process indicated that a 3 megawatt burst (I believe it was less then .1 second) was possible. At the time, as I wanted to propose a system that can produce a peak 6000 megawatt collision, I decided to propose perforated plates, each plate carefully lined up with the other. The idea was to create very high precision particle streams that could be accelerated in the chamber. Again since I am not a particle physics guy, I am not educated in the amount of particle density and energy that is needed to sustain for even a small amount of time a fusion condition.

As time went on, I decided that it made more sense if I took my 2000 particle streams and strongly condensed them right at the collision site or sites. I knew from my mechanical engineering studies that the collision point would be similar to a venturi apparatus and that the velocities would be sky high in the “pinched” areas and that the temperatures would go through the roof.

I am still envisioning very carefully timed and measured batches of isotopes. As for an example, the particle streams on the left side of the oval would be accelerated to a much greater velocity then the particle streams that are emitted from the right side. This will cause a gradient where the average velocity will be substantial and will be in the clockwise direction. The expectation is to create the first collision on the left side of the oval in the “protected area” of the chamber which is defined as a highly classified top secret material, well known to the material scientists that worked with it in the early eighties and used in aerospace development. Unfortunately the exact nature and function is only known within that realm of the Department of Defense with sufficient clearance. But it is with my awareness of this material and its conditions of its use that I am aware of the tremendous temperatures that this material can resist.

The purpose of the classified material is to sustain without damage the initial collision point; as at that point in the structure, the velocities of the particles will not be high enough and it is expected that in that area, the relatively slow particles, with their extremely high temperatures would damage or destroy the heat transfer surfaces. Extremely high acceleration is mandatory in the classified parts of the tunnel and it is necessary to get the velocities in the particle streams as high as it is necessary, so that the particle streams do not damage the stainless steel heat transfer surfaces. I do not, of course, know what particle speeds I need to protect the heat exchange surfaces, but to me, if the velocities are high enough then the tens of millions of degrees will pass by the heat transfer surfaces so fast that there will be no damage to them.

The main chamber has to be designed so that each reaction has enough time to “spin” around the track to the point at which the fusion “burst” goes out.

I have not completed a careful study of the necessary vacuum pumps, but I think that we might be able to have many bursts in a row, before the particle count within the tunnel renders ignition impossible.

It is my expectation that the first collision point, will, as stated above be on the left side and with great velocity will go out in the inert portion on the other side of the oval. At that point another “batch” of deuterium – tritium particles will be sent into the tunnel, carefully timed and measured, but this time, the particles that are emitted on the left of the oval will have a slower velocity then the particles on the right, and the point of collision will occur on the right side of the oval in the classified area which is similar in scope to the left side classified area.

I envision a grandfather clock system, where the light spins first left to right and then returns right to left and I expect since the total reaction is a fraction of a second that the human eye certainly will not be able to follow it.

I do understand that what I am proposing involves horrendous temperatures and energy releases and I expect that if this machine is built that we will have to “tread lightly” as we slowly ratchet up the batches and the timing, Even so, at present, I think that my idea deserves attention and it is my dream (of course) that we build a system such as I describe. I understand and I too am very hopeful for the “best way” to be developed, but I just have to say in passing that since no scientist or engineer knows when the “point of no return” that the earth cannot recover from, no matter what Mankind does, that what I am offering here is a “stop gap” measure until we have mastered the continuous fusion system.

Thank you for your kind attention,

God Bless America

Michael C Hecht (licensed by examination and degreed in both Mechanical and Electrical Engineering)

8162878018

MISSOURI BOURBON
GEORGETOWN, TX

If you think this post is inappropriate, please click here.

Post message.